flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 10 blog posts from 2013

Top 10 blog posts from 2013

A roundup of the most popular blog posts on BDCnetwork.com in 2013.


By BD+C Staff | December 31, 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

 

 

 

 

1. Lawsuit teaches valuable lesson on BIM and communication 

While browsing through some magazines on a flight, I read a cautionary tale about one of the first BIM-related lawsuits. The crux of the issue centered on the lack of communication between the architect, MEP engineer, and contractor. By Sasha Reed  Read the post.

 

 

2. Eight of history’s biggest design blunders

“Learn from the mistakes of others. You can’t live long enough to make them all yourself.” Eleanor Roosevelt’s famous quote rings true when one considers the many failures and resulting lessons learned in the history of architecture, engineering and design. By Cannon Design  Read the post.

 

 

3. Arthur Gensler to architects: Don't give away your ideas 

The founder of Gensler advises dozens of up-and-coming AEC professionals at BD+C's Under 40 Leadership Summit in San Francisco. By David Barista  Read the post.

 

 

4. Are these the '10 buildings that changed America'? Not likely

The other day we posted an announcement about PBS's upcoming special, "10 Buildings That Changed America." I don't pretend to be an architectural historian, but does anyone else think there are some unusual choices here? By Robert Cassidy  Read the post.

 

 

5. Brainstorming solutions to BIM implementation challenges – What hardware do you really need?

Even as more owners, agencies, and AEC firms are turning to BIM, it is impossible to ignore the fact that many of these organizations are still struggling with BIM implementation. By Sasha Reed  Read the post.

 

 

6. Three new insulation materials could be powerful solutions on commercial retrofits 

Three innovative insulation materials, including vacuum insulation panels and phase-change materials, could soon be used for commercial building retrofits in the U.S., as costs of these products fall and revamped local building codes allow their use. By Drew Ballensky  Read the post.

 

 

7. Does billing by the hour still make sense?

What’s an idea really worth? That’s the question posed by The New York Times in a provocative article that explores whether the notion of billing time still makes economic sense. By Steven Burns  Read the post.

 

 

8. BIM 2.0 and Google Glass: Science fiction or coming attractions for a job site near you?

Todd Wynne of Rogers-O’Brien Construction is one of only 8,000 people around the globe granted a pair of Google Glass for testing. Here's what he's been up to with the technology. By Sasha Reed  Read the post.

 

 

9. Better ways to manage PDF drawing sets – A customer's wish comes true

Sometimes in order to solve a challenge, you simply need walk around the problem and look at it from different angles. By Sasha Reed  Read the post.

 

 

10. Shuttered Pyramid arena in Memphis to be renovated for Bass Pro Shops

The vacant Pyramid arena in downtown Memphis will be transformed into a Bass Pro Shop. Instead of a 210-room hotel on three floors around The Pyramid's interior, Bass Pro Shops founder Johnny Morris is considering building 60 to 80 "cabins" inside the building. By Drew Ballensky  Read the post.

   

Related Stories

Resiliency | Sep 25, 2023

National Institute of Building Sciences, Fannie Mae release roadmap for resilience

The National Institute of Building Sciences and Fannie Mae have released the Resilience Incentivization Roadmap 2.0. The document is intended to guide mitigation investment to prepare for and respond to natural disasters.

Data Centers | Sep 21, 2023

North American data center construction rises 25% to record high in first half of 2023, driven by growth of artificial intelligence

CBRE’s latest North American Data Center Trends Report found there is 2,287.6 megawatts (MW) of data center supply currently under construction in primary markets, reaching a new all-time high with more than 70% already preleased. 

Giants 400 | Sep 20, 2023

Top 130 Hospitality Facility Architecture Firms for 2023

Gensler, WATG, HKS, and JCJ Architecture top BD+C's ranking of the nation's largest hospitality facilities sector architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking includes revenue for all hospitality facilities work, including casinos, hotels, and resorts. 

Adaptive Reuse | Sep 19, 2023

Transforming shopping malls into 21st century neighborhoods

As we reimagine the antiquated shopping mall, Marc Asnis, AICP, Associate, Perkins&Will, details four first steps to consider.

Giants 400 | Sep 18, 2023

Top 200 Office Building Architecture Firms for 2023

Gensler, Stantec, HOK, and Interior Architects top BD+C's ranking of the nation's largest office building sector architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. Note: This ranking includes revenue for all office building work, including core and shell projects and workplace/interior fitouts. 

Resort Design | Sep 18, 2023

Luxury resort provides new housing community for its employees

The Wisteria community will feature a slew of exclusive amenities, including a market, pub, and fitness center, in addition to 33 new patio homes.

Life of an Architect Podcast | Sep 18, 2023

Life of an Architect Podcast Ep. 134: Management 101

It happens to most people eventually. Some get there quickly, while others take a bit longer. Transitioning into a management role is a natural evolution of skill development, but that doesn’t necessarily make it any easier. Chances are you’re ready for management, but in case you’ve questions, we think we have answers.

Hotel Facilities | Sep 15, 2023

The next phase of sustainability in luxury hotels

The luxury hotel market has seen an increase in green-minded guests looking for opportunities to support businesses that are conscientious of the environment.

Adaptive Reuse | Sep 15, 2023

Salt Lake City’s Frank E. Moss U.S. Courthouse will transform into a modern workplace for federal agencies

In downtown Salt Lake City, the Frank E. Moss U.S. Courthouse is being transformed into a modern workplace for about a dozen federal agencies. By providing offices for agencies previously housed elsewhere, the adaptive reuse project is expected to realize an annual savings for the federal government of up to $6 million in lease costs.

Data Centers | Sep 15, 2023

Power constraints are restricting data center market growth

There is record global demand for new data centers, but availability of power is hampering market growth. That’s one of the key findings from a new CBRE report: Global Data Center Trends 2023.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021