flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 10 blog posts from 2013

Top 10 blog posts from 2013

A roundup of the most popular blog posts on BDCnetwork.com in 2013.


By BD+C Staff | December 31, 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

 

 

 

 

1. Lawsuit teaches valuable lesson on BIM and communication 

While browsing through some magazines on a flight, I read a cautionary tale about one of the first BIM-related lawsuits. The crux of the issue centered on the lack of communication between the architect, MEP engineer, and contractor. By Sasha Reed  Read the post.

 

 

2. Eight of history’s biggest design blunders

“Learn from the mistakes of others. You can’t live long enough to make them all yourself.” Eleanor Roosevelt’s famous quote rings true when one considers the many failures and resulting lessons learned in the history of architecture, engineering and design. By Cannon Design  Read the post.

 

 

3. Arthur Gensler to architects: Don't give away your ideas 

The founder of Gensler advises dozens of up-and-coming AEC professionals at BD+C's Under 40 Leadership Summit in San Francisco. By David Barista  Read the post.

 

 

4. Are these the '10 buildings that changed America'? Not likely

The other day we posted an announcement about PBS's upcoming special, "10 Buildings That Changed America." I don't pretend to be an architectural historian, but does anyone else think there are some unusual choices here? By Robert Cassidy  Read the post.

 

 

5. Brainstorming solutions to BIM implementation challenges – What hardware do you really need?

Even as more owners, agencies, and AEC firms are turning to BIM, it is impossible to ignore the fact that many of these organizations are still struggling with BIM implementation. By Sasha Reed  Read the post.

 

 

6. Three new insulation materials could be powerful solutions on commercial retrofits 

Three innovative insulation materials, including vacuum insulation panels and phase-change materials, could soon be used for commercial building retrofits in the U.S., as costs of these products fall and revamped local building codes allow their use. By Drew Ballensky  Read the post.

 

 

7. Does billing by the hour still make sense?

What’s an idea really worth? That’s the question posed by The New York Times in a provocative article that explores whether the notion of billing time still makes economic sense. By Steven Burns  Read the post.

 

 

8. BIM 2.0 and Google Glass: Science fiction or coming attractions for a job site near you?

Todd Wynne of Rogers-O’Brien Construction is one of only 8,000 people around the globe granted a pair of Google Glass for testing. Here's what he's been up to with the technology. By Sasha Reed  Read the post.

 

 

9. Better ways to manage PDF drawing sets – A customer's wish comes true

Sometimes in order to solve a challenge, you simply need walk around the problem and look at it from different angles. By Sasha Reed  Read the post.

 

 

10. Shuttered Pyramid arena in Memphis to be renovated for Bass Pro Shops

The vacant Pyramid arena in downtown Memphis will be transformed into a Bass Pro Shop. Instead of a 210-room hotel on three floors around The Pyramid's interior, Bass Pro Shops founder Johnny Morris is considering building 60 to 80 "cabins" inside the building. By Drew Ballensky  Read the post.

   

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021