TOP 110 MULTIFAMILY ARCHITECTURE FIRMS | ||
Rank | Firm | 2015 Revenue |
1 | Perkins Eastman | $50,700,000 |
2 | CallisonRTKL | $40,466,000 |
3 | Solomon Cordwell Buenz | $38,438,935 |
4 | Skidmore, Owings & Merrill | $27,342,575 |
5 | Niles Bolton Associates | $27,300,000 |
6 | NORR | $24,325,290 |
7 | Stantec | $24,249,806 |
8 | Robert A.M. Stern Architects | $22,990,000 |
9 | WDG | $22,938,000 |
10 | Harley Ellis Devereaux | $18,300,000 |
11 | Hord Coplan Macht | $17,895,061 |
12 | GGLO | $16,850,000 |
13 | HOK | $16,106,000 |
14 | Carrier Johnson + Culture | $13,300,801 |
15 | Dattner Architects | $11,862,095 |
16 | Weber Thompson | $11,727,906 |
17 | Perkins+Will | $11,120,000 |
18 | GFF | $10,873,325 |
19 | Smallwood, Reynolds, Stewart, Stewart & Assoc. | $10,131,014 |
20 | Mithun | $9,994,000 |
21 | Lord Aeck Sargent | $9,941,025 |
22 | FXFOWLE | $8,962,259 |
23 | HKS | $8,844,830 |
24 | Beyer Blinder Belle Architects & Planners | $8,623,712 |
25 | Gensler | $8,440,000 |
26 | OZ Architecture | $8,421,793 |
27 | Cooper Carry | $7,900,625 |
28 | EDI International | $7,441,895 |
29 | Rule Joy Trammell + Rubio | $6,817,208 |
30 | Nadel | $6,717,110 |
31 | Page | $6,500,000 |
32 | FitzGerald Associates Architects | $6,327,000 |
33 | Architects Hawaii Ltd. | $5,799,000 |
34 | Eppstein Uhen Architects | $5,782,685 |
35 | SB Architects | $5,591,249 |
36 | Moody Nolan | $5,320,000 |
37 | Grimm + Parker Architects | $5,310,982 |
38 | Moseley Architects | $4,868,448 |
39 | Cambridge Seven Associates | $4,585,000 |
40 | ZGF Architects | $4,559,845 |
41 | BKSK Architects | $3,441,488 |
42 | Cuningham Group Architecture | $3,373,585 |
43 | Montroy Andersen DeMarco | $3,300,000 |
44 | Shepley Bulfinch | $2,827,365 |
45 | Morris Architects | $2,784,000 |
46 | STG Design | $2,736,000 |
47 | GreenbergFarrow | $2,676,483 |
48 | LS3P | $2,330,985 |
49 | Corgan | $2,300,000 |
50 | Adrian Smith + Gordon Gill Architecture | $2,214,844 |
51 | GBBN Architects | $2,100,000 |
52 | MBH Architects | $2,085,000 |
53 | Hnedak Bobo Group | $2,061,132 |
54 | Kirksey Architecture | $2,027,474 |
55 | VOA Associates | $2,016,188 |
56 | Environetics | $2,016,165 |
57 | Vocon | $1,987,312 |
58 | Lawrence Group | $1,929,000 |
59 | Paulus, Sokolowski and Sartor | $1,847,800 |
60 | Rottet Studio | $1,825,000 |
61 | Westlake Reed Leskosky | $1,817,695 |
62 | Wold Architects and Engineers | $1,800,000 |
63 | Leo A Daly | $1,693,804 |
64 | DAG Architects | $1,500,000 |
65 | P+R Architects | $1,500,000 |
66 | Hoffmann Architects | $1,359,121 |
67 | Goettsch Partners | $1,300,000 |
68 | Architecture Design Collaborative | $1,200,000 |
69 | Studios Architecture | $1,188,286 |
70 | Diamond Schmitt Architects | $1,188,000 |
71 | Goodwyn, Mills and Cawood | $1,114,902 |
72 | SMMA | Symmes Maini & McKee Associates | $1,101,425 |
73 | Large Architecture | $1,098,000 |
74 | 4240 Architecture | $1,088,432 |
75 | Davis Brody Bond | $1,057,650 |
76 | Becker Morgan Group | $1,017,266 |
77 | BLDD Architects | $1,000,000 |
78 | ACAI Associates | $1,000,000 |
79 | Zyscovich Architects | $969,024 |
80 | Clark Nexsen | $883,198 |
81 | MV+A Architects | $865,993 |
82 | LMN Architects | $808,000 |
83 | Beck Group, The | $786,240 |
84 | Urbahn Architects | $725,000 |
85 | Herschman Architects | $703,000 |
86 | CTA Architects Engineers | $696,686 |
87 | MG2 | $654,968 |
88 | Guernsey | $647,911 |
89 | JLG Architects | $644,268 |
90 | Baskervill | $625,334 |
91 | KSQ Design | $548,089 |
92 | HGA | $493,000 |
93 | Heery International | $479,325 |
94 | RNL Design | $438,600 |
95 | HMFH Architects | $411,515 |
96 | LK Architecture | $350,000 |
97 | Bergmann Associates | $337,969 |
98 | Nelson Worldwide Holdings | $306,078 |
99 | NAC Architecture | $303,708 |
100 | Epstein | $300,100 |
101 | Gresham, Smith and Partners | $280,000 |
102 | JRS Architect | $275,000 |
103 | FreemanWhite | $205,548 |
104 | Albert Kahn Associates | $200,000 |
105 | Marshall Craft Associates | $174,525 |
106 | Jonathan Nehmer + Associates | $158,867 |
107 | ATA Beilharz Architects | $147,760 |
108 | LPA | $101,505 |
109 | Inventure Design Group | $100,477 |
110 | Barge Waggoner Sumner & Cannon | $100,000 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.