flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 30 Sports Facility Engineering Firms

Top 30 Sports Facility Engineering Firms

AECOM, Thornton Tomasetti, and ME Engineers top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

Baxter Arena, University of Nebraska, Omaha, Neb. Image courtesy of HDR Architecture, Inc.

TOP 30 SPORTS FACILITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $30,000,000
2 Thornton Tomasetti $21,316,147
3 ME Engineers $18,950,000
4 Walter P Moore $18,678,163
5 WSP | Parsons Brinckerhoff $18,245,000
6 Henderson Engineers $18,179,333
7 Smith Seckman Reid $7,981,930
8 Jacobs $6,930,000
9 Magnusson Klemencic Associates $4,134,707
10 KJWW / TTG $3,320,000
11 Wiss, Janney, Elstner Associates $2,930,000
12 Environmental Systems Design $2,619,733
13 Peter Basso Associates $2,136,605
14 Dewberry $2,112,240
15 Arup $2,062,091
16 Rist-Frost-Shumway Engineering $1,900,000
17 Simpson Gumpertz & Heger $1,796,000
18 Graef $1,716,269
19 TLC Engineering for Architecture $1,489,956
20 Jensen Hughes $1,222,576
21 Interface Engineering $1,031,658
22 KZF Design $1,018,479
23 Shive-Hattery $1,015,197
24 RMF Engineering $838,000
25 Baird, Hampton & Brown $756,502
26 STV $701,926
27 Davis, Bowen & Friedel $476,707
28 Bala Consulting Engineers $400,000
29 Luckett & Farley $380,197
30 Vanderweil Engineers $309,400
31 ThermalTech Engineering $300,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 29, 2012

C.W. Driver opens new office, appoints Castillo regional SVP

Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021