flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 35 Airport Terminal Architecture and A/E Firms

Top 35 Airport Terminal Architecture and A/E Firms

Corgan, HOK, and Gensler top Building Design+Construction’s annual ranking of the nation’s largest airport terminal architecture and A/E firms, as reported in the 2016 Giants 300 Report.

 


By BD+C Editors | July 29, 2016
Top 35 Airport Terminal Architecture and A/E Firms

Concourse J at Miami International Airport. Photo: Martin St-Amant/Wikimedia Commons.

TOP AIRPORT TERMINAL ARCHITECTURE
AND A/E FIRMS
Rank Firm 2015 Revenue
1 Corgan $65,839,265
2 HOK $60,840,000
3 Gensler $44,390,000
4 Gresham, Smith and Partners $25,600,000
5 RS&H $24,300,000
6 Stantec $19,226,351
7 HNTB Corporation $15,998,381
8 HKS $15,309,071
9 Leo A Daly $13,529,252
10 Alliiance $11,260,000
11 Heery International $9,935,444
12 Schenkel & Shultz $8,367,781
13 Skidmore, Owings & Merrill $7,687,996
14 NORR $5,535,839
15 Morris Architects $3,474,000
16 ACAI Associates $3,000,000
17 Perkins+Will $2,260,000
18 ZGF Architects $1,685,426
19 Solomon Cordwell Buenz $1,570,727
20 Clark Nexsen $1,414,083
21 Epstein $1,368,000
22 LS3P $1,307,775
23 BRPH $892,873
24 Populous $820,970
25 Barge Waggoner Sumner & Cannon $500,000
26 Parkhill, Smith & Cooper $396,976
27 Zyscovich Architects $390,118
28 CTA Architects Engineers $266,008
29 Nadel $253,333
30 Dattner Architects $250,000
31 Guernsey $94,403
32 Architects Hawaii Ltd. $84,000
33 JLG Architects $83,652
34 Paulus, Sokolowski and Sartor $71,200
35 HGA $59,000
36 Beyer Blinder Belle Architects & Planners $34,091
37 GRW $6,791

 

RETURN TO THE GIANTS 300 LANDING PAGE

Tags

Related Stories

| Jun 13, 2013

AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition

The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York. 

| Jun 12, 2013

More than 90% of New York City schools have code violations

More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.

| Jun 12, 2013

5 building projects that put the 'team' in teamwork

The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team. 

| Jun 12, 2013

Sacred synergy achieves goals for religious education [2013 Building Team Award winner]

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.

| Jun 12, 2013

‘Talking’ Braille maps help the visual impaired

Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.

| Jun 11, 2013

Music/dance building supports sweet harmony [2013 Building Team Award winner]

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.

| Jun 11, 2013

Vertical urban campus fills a tall order [2013 Building Team Award winner]

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.

| Jun 11, 2013

Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021