flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 40 Science + Technology Architecture Firms

Top 40 Science + Technology Architecture Firms

Perkins+Will, HDR, and HOK top Building Design+Construction’s annual ranking of the nation’s largest science + technology sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 12, 2016

Georgia BioScience Training Center, Atlanta, Ga. Cooper Carry (architect), Technical College System of Georgia (owner), NBP Engineers (MEP), Eberly & Associates (CE). Photo: Carol Meyhoefer courtesy of Cooper Carry.

TOP 40 SCIENCE + TECHNOLOGY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Perkins+Will $60,040,000
2 HDR $56,664,000
3 HOK $50,435,000
4 Payette $35,458,760
5 Stantec $34,755,593
6 Flad Architects $29,730,000
7 SmithGroupJJR $26,205,000
8 DGA $21,133,997
9 Page $19,500,000
10 ZGF Architects $18,405,848
11 CannonDesign $18,200,000
12 EwingCole $13,140,000
13 EYP $10,251,000
14 Studios Architecture $9,469,391
15 BRPH $8,718,716
16 Paulus, Sokolowski and Sartor $8,019,100
17 Perkins Eastman $7,800,000
18 Harley Ellis Devereaux $7,800,000
19 NBBJ $7,000,000
20 Lord Aeck Sargent $6,657,882
21 Davis Brody Bond $6,232,862
22 RS&H $5,400,000
23 Clark Nexsen $5,300,000
24 Kirksey Architecture $4,739,638
25 Gensler $4,120,000
26 Hastings+Chivetta Architects $3,850,000
27 HKS $3,163,447
28 BWBR $3,100,508
29 SMMA | Symmes Maini & McKee Associates $2,319,498
30 Tsoi/Kobus & Associates $2,171,212
31 Ware Malcomb $2,137,290
32 Alliiance $2,095,730
33 HGA $1,420,000
34 NORR $1,371,368
35 RSP Architects $1,370,000
36 VOA Associates $1,276,849
37 Solomon Cordwell Buenz $1,198,928
38 Skidmore, Owings & Merrill $1,150,519
39 Heery International $921,161
40 Emersion Design $913,189
41 Leo A Daly $844,837
42 Diamond Schmitt Architects $727,000
43 OZ Architecture $709,710
44 Guernsey $685,926
45 Wilson Architects $550,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 29, 2012

Apartments provide permanent housing for California homeless

Gonzalez Goodale Architects designed complex to embrace community and engender sense of pride among residents.

| Mar 28, 2012

40 Under 40, the Class of 2012

Chosen from 223 applicants, these 40 young AEC professionals represent the Class of 2012 in Building Design+Construction’s “40 UNDER 40” competition.

| Mar 28, 2012

Milestone reached for LEED-certified buildings?

Total number of major global green buildings now stands at 12,000.

| Mar 28, 2012

Holden Cancer Center opens at University of Iowa Hospitals and Clinics

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

| Mar 28, 2012

Meridian Design Build Begins work on 38 acre redevelopment project

The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.

| Mar 28, 2012

Tsoi/Kobis & Associates developing master plan for UT Southwestern Medical Center

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

| Mar 28, 2012

Ideas and input drive stories in online community, noraXchange

Community designed to help building and design professionals address challenges they face in their jobs. 

| Mar 27, 2012

Bank of America Plaza becomes Atlanta's priciest repo

Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021