flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Sports Facility Architecture Firms

Top 50 Sports Facility Architecture Firms

Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

The Pavilion at Ole Miss, Oxford, Miss. AECOM (architect) and BL Harbert International (GC). Image courtesy of AECOM.

TOP 50 SPORTS FACILITY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Populous $113,741,160
2 HKS $81,220,737
3 HOK $58,589,000
4 Gensler $42,850,000
5 HNTB Corporation $13,419,171
6 Cuningham Group Architecture $10,238,235
7 Moody Nolan $9,800,000
8 Sink Combs Dethlefs $9,719,919
9 VOA Associates $9,577,715
10 Stantec $8,654,844
11 DLR Group $8,400,000
12 Heery International $7,543,712
13 Rossetti $6,307,635
14 PBK $6,120,000
15 MEIS $5,800,000
16 JLG Architects $5,606,613
17 LPA $5,563,065
18 Beck Group, The $5,257,064
19 BWBR $4,061,299
20 CallisonRTKL $3,808,000
21 Diamond Schmitt Architects $3,324,000
22 EwingCole $3,285,000
23 tvsdesign $2,840,000
24 Perkins+Will $2,600,000
25 Becker Morgan Group $2,597,913
26 NORR $2,146,059
27 LS3P $2,054,885
28 NBBJ $2,000,000
29 Perkins Eastman $1,950,000
30 Rosser International $1,834,689
31 S/L/A/M Collaborative, The $1,576,000
32 GFF $1,485,422
33 ZGF Architects $1,419,287
34 DLA+ Architecture & Interior Design $1,363,472
35 Goodwyn, Mills and Cawood $1,320,557
36 HDR $1,259,200
37 Convergence Design $1,226,000
38 Alliiance $1,168,050
39 Eppstein Uhen Architects $1,091,981
40 CTA Architects Engineers $880,580
41 Kirksey Architecture $836,448
42 HGA $822,000
43 BBS Architects and Engineers $800,000
44 Guernsey $785,038
45 Architects Hawaii Ltd. $719,000
46 Clark Nexsen $700,000
47 GSB $624,057
48 SMMA | Symmes Maini & McKee Associates $606,596
49 GWWO $588,114
50 Leo A Daly $521,100

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

| Oct 25, 2011

DOE issues report on financing solar photovoltaic systems for K-12 schools

The report examines the two primary types of ownership models used to obtain solar installations. This analysis can help school administrators across the country select the best option for deploying solar technologies in their school districts.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021