flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Sports Facility Architecture Firms

Top 50 Sports Facility Architecture Firms

Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

The Pavilion at Ole Miss, Oxford, Miss. AECOM (architect) and BL Harbert International (GC). Image courtesy of AECOM.

TOP 50 SPORTS FACILITY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Populous $113,741,160
2 HKS $81,220,737
3 HOK $58,589,000
4 Gensler $42,850,000
5 HNTB Corporation $13,419,171
6 Cuningham Group Architecture $10,238,235
7 Moody Nolan $9,800,000
8 Sink Combs Dethlefs $9,719,919
9 VOA Associates $9,577,715
10 Stantec $8,654,844
11 DLR Group $8,400,000
12 Heery International $7,543,712
13 Rossetti $6,307,635
14 PBK $6,120,000
15 MEIS $5,800,000
16 JLG Architects $5,606,613
17 LPA $5,563,065
18 Beck Group, The $5,257,064
19 BWBR $4,061,299
20 CallisonRTKL $3,808,000
21 Diamond Schmitt Architects $3,324,000
22 EwingCole $3,285,000
23 tvsdesign $2,840,000
24 Perkins+Will $2,600,000
25 Becker Morgan Group $2,597,913
26 NORR $2,146,059
27 LS3P $2,054,885
28 NBBJ $2,000,000
29 Perkins Eastman $1,950,000
30 Rosser International $1,834,689
31 S/L/A/M Collaborative, The $1,576,000
32 GFF $1,485,422
33 ZGF Architects $1,419,287
34 DLA+ Architecture & Interior Design $1,363,472
35 Goodwyn, Mills and Cawood $1,320,557
36 HDR $1,259,200
37 Convergence Design $1,226,000
38 Alliiance $1,168,050
39 Eppstein Uhen Architects $1,091,981
40 CTA Architects Engineers $880,580
41 Kirksey Architecture $836,448
42 HGA $822,000
43 BBS Architects and Engineers $800,000
44 Guernsey $785,038
45 Architects Hawaii Ltd. $719,000
46 Clark Nexsen $700,000
47 GSB $624,057
48 SMMA | Symmes Maini & McKee Associates $606,596
49 GWWO $588,114
50 Leo A Daly $521,100

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Software an architectural game changer

Interactive modeling software transforms the design­build process. 

| Oct 5, 2011

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes

Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 5, 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021