flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Sports Facility Architecture Firms

Top 50 Sports Facility Architecture Firms

Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

The Pavilion at Ole Miss, Oxford, Miss. AECOM (architect) and BL Harbert International (GC). Image courtesy of AECOM.

TOP 50 SPORTS FACILITY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Populous $113,741,160
2 HKS $81,220,737
3 HOK $58,589,000
4 Gensler $42,850,000
5 HNTB Corporation $13,419,171
6 Cuningham Group Architecture $10,238,235
7 Moody Nolan $9,800,000
8 Sink Combs Dethlefs $9,719,919
9 VOA Associates $9,577,715
10 Stantec $8,654,844
11 DLR Group $8,400,000
12 Heery International $7,543,712
13 Rossetti $6,307,635
14 PBK $6,120,000
15 MEIS $5,800,000
16 JLG Architects $5,606,613
17 LPA $5,563,065
18 Beck Group, The $5,257,064
19 BWBR $4,061,299
20 CallisonRTKL $3,808,000
21 Diamond Schmitt Architects $3,324,000
22 EwingCole $3,285,000
23 tvsdesign $2,840,000
24 Perkins+Will $2,600,000
25 Becker Morgan Group $2,597,913
26 NORR $2,146,059
27 LS3P $2,054,885
28 NBBJ $2,000,000
29 Perkins Eastman $1,950,000
30 Rosser International $1,834,689
31 S/L/A/M Collaborative, The $1,576,000
32 GFF $1,485,422
33 ZGF Architects $1,419,287
34 DLA+ Architecture & Interior Design $1,363,472
35 Goodwyn, Mills and Cawood $1,320,557
36 HDR $1,259,200
37 Convergence Design $1,226,000
38 Alliiance $1,168,050
39 Eppstein Uhen Architects $1,091,981
40 CTA Architects Engineers $880,580
41 Kirksey Architecture $836,448
42 HGA $822,000
43 BBS Architects and Engineers $800,000
44 Guernsey $785,038
45 Architects Hawaii Ltd. $719,000
46 Clark Nexsen $700,000
47 GSB $624,057
48 SMMA | Symmes Maini & McKee Associates $606,596
49 GWWO $588,114
50 Leo A Daly $521,100

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

| Dec 7, 2010

Blue is the future of green design

Blue design creates places that are not just neutral, but actually add back to the world and is the future of sustainable design and architecture, according to an interview with Paul Eagle, managing director of Perkins+Will, New York; and Janice Barnes, principal at the firm and global discipline leader for planning and strategies.

| Dec 7, 2010

Green building thrives in shaky economy

Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.

| Dec 7, 2010

USGBC: Wood-certification benchmarks fail to pass

The proposed Forest Certification Benchmark to determine when wood-certification groups would have their certification qualify for points in the LEED rating systemdid not pass the USGBC member ballot. As a result, the Certified Wood credit in LEED will remain as it is currently written. To date, only wood certified by the Forest Stewardship Council qualifies for a point in the LEED, while other organizations, such as the Sustainable Forestry Initiative, the Canadian Standards Association, and the American Tree Farm System, are excluded.

| Dec 7, 2010

Prospects for multifamily sector improve greatly

The multifamily sector is showing signs of a real recovery, with nearly 22,000 new apartment units delivered to the market. Net absorption in the third quarter surged by 94,000 units, dropping the national vacancy rate from 7.8% to 7.1%, one of the largest quarterly drops on record, and rents increased for the second quarter in a row.

| Dec 7, 2010

Hot rumor: Norman Foster designing Apple’s new campus

Lord Norman Foster, reportedly has been selected to design Apple’s new campus in Cupertino, Calif. If the news is true, Foster is a good match for Apple say experts. Foster built his celebrity by marrying big gestures to technological wizardry. And, unlike some starchitects, he has glommed onto the environmental revolution—something Apple has made a point of embracing, too.

| Dec 7, 2010

10 megacities of the near future

With Beijing, Shanghai, and Mumbai already on the global radar, where can the next wave of construction be found? Far beyond China, India, and even Brazil it’s predicted. The world’s next future megacities could include Istanbul, Turkey; Ho Chi Minh City, Vietnam; and Khartoum, Sudan, among others. Read about these emerging and little-known behemoths.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021