flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 50 Sports Facility Architecture Firms

Top 50 Sports Facility Architecture Firms

Populous, HKS, and HOK top Building Design+Construction’s annual ranking of the nation’s largest sports facility sector architecture and A/E firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 15, 2016

The Pavilion at Ole Miss, Oxford, Miss. AECOM (architect) and BL Harbert International (GC). Image courtesy of AECOM.

TOP 50 SPORTS FACILITY ARCHITECTURE FIRMS
Rank Firm 2015 Revenue
1 Populous $113,741,160
2 HKS $81,220,737
3 HOK $58,589,000
4 Gensler $42,850,000
5 HNTB Corporation $13,419,171
6 Cuningham Group Architecture $10,238,235
7 Moody Nolan $9,800,000
8 Sink Combs Dethlefs $9,719,919
9 VOA Associates $9,577,715
10 Stantec $8,654,844
11 DLR Group $8,400,000
12 Heery International $7,543,712
13 Rossetti $6,307,635
14 PBK $6,120,000
15 MEIS $5,800,000
16 JLG Architects $5,606,613
17 LPA $5,563,065
18 Beck Group, The $5,257,064
19 BWBR $4,061,299
20 CallisonRTKL $3,808,000
21 Diamond Schmitt Architects $3,324,000
22 EwingCole $3,285,000
23 tvsdesign $2,840,000
24 Perkins+Will $2,600,000
25 Becker Morgan Group $2,597,913
26 NORR $2,146,059
27 LS3P $2,054,885
28 NBBJ $2,000,000
29 Perkins Eastman $1,950,000
30 Rosser International $1,834,689
31 S/L/A/M Collaborative, The $1,576,000
32 GFF $1,485,422
33 ZGF Architects $1,419,287
34 DLA+ Architecture & Interior Design $1,363,472
35 Goodwyn, Mills and Cawood $1,320,557
36 HDR $1,259,200
37 Convergence Design $1,226,000
38 Alliiance $1,168,050
39 Eppstein Uhen Architects $1,091,981
40 CTA Architects Engineers $880,580
41 Kirksey Architecture $836,448
42 HGA $822,000
43 BBS Architects and Engineers $800,000
44 Guernsey $785,038
45 Architects Hawaii Ltd. $719,000
46 Clark Nexsen $700,000
47 GSB $624,057
48 SMMA | Symmes Maini & McKee Associates $606,596
49 GWWO $588,114
50 Leo A Daly $521,100

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Sep 16, 2010

Gehry’s Santa Monica Place gets a wave of changes

Omniplan, in association with Jerde Partnership, created an updated design for Santa Monica Place, a shopping mall designed by Frank Gehry in 1980.

| Sep 16, 2010

Green recreation/wellness center targets physical, environmental health

The 151,000-sf recreation and wellness center at California State University’s Sacramento campus, called the WELL (for “wellness, education, leisure, lifestyle”), has a fitness center, café, indoor track, gymnasium, racquetball courts, educational and counseling space, the largest rock climbing wall in the CSU system.

| Sep 13, 2010

Community college police, parking structure targets LEED Platinum

The San Diego Community College District's $1.555 billion construction program continues with groundbreaking for a 6,000-sf police substation and an 828-space, four-story parking structure at San Diego Miramar College.

| Sep 13, 2010

Campus housing fosters community connection

A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021