TOP 60 GREEN BUILDING ENGINEERING FIRMS | ||
Rank | Firm | 2015 Revenue |
1 | Jacobs | $203,161,333 |
2 | AECOM | $200,900,000 |
3 | Arup | $168,783,060 |
4 | Thornton Tomasetti | $67,382,221 |
5 | Syska Hennessy Group | $32,420,857 |
6 | Burns & McDonnell | $24,341,832 |
7 | Vanderweil Engineers | $23,508,800 |
8 | Smith Seckman Reid | $20,189,000 |
9 | DeSimone Consulting Engineers | $19,799,641 |
10 | Dewberry | $19,159,460 |
11 | Jensen Hughes | $17,500,000 |
12 | STV | $13,549,152 |
13 | Hankins and Anderson | $12,643,747 |
14 | Affiliated Engineers | $11,045,709 |
15 | KJWW / TTG | $10,750,000 |
16 | Walter P Moore | $10,727,343 |
17 | Bala Consulting Engineers | $10,300,000 |
18 | RMF Engineering | $9,218,000 |
19 | Interface Engineering | $7,325,183 |
20 | TLC Engineering for Architecture | $7,178,353 |
21 | Henderson Engineers | $7,020,123 |
22 | Newcomb & Boyd | $6,793,882 |
23 | Spectrum Engineers | $6,701,583 |
24 | M/E Engineering | $5,157,190 |
25 | Benham Design | $5,101,280 |
26 | I. C. Thomasson Associates | $5,000,000 |
27 | Hixson Architecture, Engineering, Interiors | $5,000,000 |
28 | Bridgers & Paxton Consulting Engineers | $4,737,841 |
29 | Magnusson Klemencic Associates | $4,364,152 |
30 | Glumac | $4,056,084 |
31 | KCI Technologies | $4,000,000 |
32 | Heapy Engineering | $3,800,000 |
33 | Wendel | $3,735,968 |
34 | Ghafari Associates | $3,300,000 |
35 | Rist-Frost-Shumway Engineering | $2,500,000 |
36 | Ross & Baruzzini | $2,500,000 |
37 | JQ Engineering | $2,481,900 |
38 | Sherlock, Smith & Adams | $2,426,000 |
39 | dbHMS | $2,304,000 |
40 | OLA Consulting Engineers | $2,250,000 |
41 | GHT Limited | $1,800,000 |
42 | P2S Engineering | $1,321,450 |
43 | Architectural Engineers | $1,143,662 |
44 | Core States Group | $1,099,996 |
45 | KZF Design | $948,362 |
46 | RDK Engineers | $873,482 |
47 | Walker Parking Consultants | $750,000 |
48 | Luckett & Farley | $725,800 |
49 | KLH Engineers | $700,000 |
50 | G & W Engineering Corp. | $600,154 |
51 | William Tao & Associates | $478,685 |
52 | H.F. Lenz Company | $352,640 |
53 | Dunham Associates | $250,000 |
54 | Pedco E & A Services | $195,000 |
55 | Cardno Haynes Whaley | $117,366 |
56 | Davis, Bowen & Friedel | $107,843 |
57 | Wick Fisher White | $105,000 |
58 | Highland Associates | $100,000 |
59 | ThermalTech Engineering | $80,000 |
60 | SSOE Group | $60,876 |
61 | Primera Engineers | $46,234 |
62 | Baird, Hampton & Brown | $6,383 |
RETURN TO THE GIANTS 300 LANDING PAGE
Related Stories
| Jan 19, 2011
New Fort Hood hospital will replace aging medical center
The Army Corps of Engineers selected London-based Balfour Beatty and St. Louis-based McCarthy to provide design-build services for the Fort Hood Replacement Hospital in Texas, a $503 million, 944,000-sf complex partially funded by the American Recovery and Reinvestment Act. The firm plans to use BIM for the project, which will include outpatient clinics, an ambulance garage, a central utility plant, and three parking structures. Texas firms HKS Architects and Wingler & Sharp will participate as design partners. The project seeks LEED Gold.
| Jan 19, 2011
Museum design integrates Greek history and architecture
Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.
| Jan 19, 2011
Large-Scale Concrete Reconstruction Solid Thinking
Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.
| Jan 10, 2011
Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’
Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.
| Jan 7, 2011
BIM on Target
By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.
| Jan 7, 2011
How Building Teams Choose Roofing Systems
A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.
| Jan 7, 2011
Total construction to rise 5.1% in 2011
Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.
| Jan 7, 2011
Mixed-Use on Steroids
Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.
| Jan 4, 2011
Product of the Week: Zinc cladding helps border crossing blend in with surroundings
Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.