flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 University Engineering Firms

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 9, 2016

UW Health at The American Center, Madison, Wis. Photo: Steve Hall © Hedrich Blessing 2015, courtesy Flad Architects.

TOP 70 UNIVERSITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $65,000,000
2 WSP | Parsons Brinckerhoff $37,988,000
3 Jacobs $31,600,000
4 Affiliated Engineers $19,264,000
5 KJWW / TTG $16,943,913
6 Arup $15,856,593
7 Vanderweil Engineers $15,351,800
8 Simpson Gumpertz & Heger $13,586,000
9 Thornton Tomasetti $13,363,234
10 Dewberry $12,904,401
11 BR+A Consulting Engineers $11,400,000
12 RMF Engineering $11,354,900
13 Burns & McDonnell $11,116,604
14 BSA LifeStructures $10,770,801
15 P2S Engineering $10,557,369
16 Shive-Hattery $8,288,709
17 Jensen Hughes $7,740,346
18 Wiss, Janney, Elstner Associates $7,740,000
19 Fishbeck, Thompson, Carr & Huber $7,500,000
20 ME Engineers $6,460,000
21 Loring Consulting Engineers $6,036,000
22 H.F. Lenz Company $4,944,856
23 Interface Engineering $4,794,573
24 M/E Engineering $4,688,355
25 Ross & Baruzzini $4,307,200
26 Heapy Engineering $4,160,676
27 STV $4,002,342
28 RDK Engineers $3,875,821
29 Glumac $3,696,480
30 TLC Engineering for Architecture $3,491,531
31 Woolpert $3,243,901
32 JQ Engineering $3,141,800
33 Rist-Frost-Shumway Engineering $3,000,000
34 Spectrum Engineers $2,971,807
35 Karpinski Engineering $2,932,833
36 Smith Seckman Reid $2,842,841
37 Peter Basso Associates $2,780,856
38 Global Engineering Solutions $2,620,000
39 Stanley Consultants $2,463,846
40 Newcomb & Boyd $2,448,645
41 Bridgers & Paxton Consulting Engineers $2,427,726
42 Henderson Engineers $2,347,476
43 Primera Engineers $2,171,401
44 Environmental Systems Design $2,095,786
45 KCI Technologies $2,000,000
46 I. C. Thomasson Associates $1,928,200
47 dbHMS $1,920,000
48 Bala Consulting Engineers $1,880,000
49 Dunham Associates $1,750,000
50 Highland Associates $1,700,000
51 CJL Engineering, Inc. $1,510,260
52 Cardno Haynes Whaley $1,483,543
53 Syska Hennessy Group $1,445,519
54 Graef $1,357,546
55 DeSimone Consulting Engineers $1,305,742
56 Wallace Engineering $1,300,000
57 KZF Design $1,074,055
58 Luckett & Farley $1,069,453
59 William Tao & Associates $946,168
60 KLH Engineers $860,386
61 Baird, Hampton & Brown $841,665
62 Mazzetti $817,330
63 CTLGroup $800,000
64 Ghafari Associates $750,000
65 Wendel $745,424
66 OLA Consulting Engineers $672,728
67 JBA Consulting Engineers $668,293
68 Magnusson Klemencic Associates $626,415
69 SSOE Group $520,000
70 ThermalTech Engineering $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

| May 18, 2011

Carnegie Hall vaults into the 21st century with a $200 million renovation

Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.

| May 17, 2011

Sustainability tops the syllabus at net-zero energy school in Texas

Texas-based firm Corgan designed the 152,200-sf Lady Bird Johnson Middle School in Irving, Texas, with the goal of creating the largest net-zero educational facility in the nation, and the first in the state. The facility is expected to use 50% less energy than a standard school.

| May 17, 2011

Gilbane partners with Steel Orca on ultra-green data center

Gilbane, along with Crabtree, Rohrbaugh & Associates, has been selected to partner with Steel Orca to design and build a 300,000-sf data center in Bucks County, Pa., that will be powered entirely through renewable energy sources--gas, solar, fuel cells, wind and geo-thermal. Completion is scheduled for 2013.

| May 17, 2011

Should Washington, D.C., allow taller buildings?

Suggestions are being made that Washington revise its restrictions on building heights. Architect Roger Lewis, who raised the topic in the Washington Post a few weeks ago, argues for a modest relaxation of the height limits, and thinks that concerns about ruining the city’s aesthetics are unfounded.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021