flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 University Engineering Firms

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 9, 2016

UW Health at The American Center, Madison, Wis. Photo: Steve Hall © Hedrich Blessing 2015, courtesy Flad Architects.

TOP 70 UNIVERSITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $65,000,000
2 WSP | Parsons Brinckerhoff $37,988,000
3 Jacobs $31,600,000
4 Affiliated Engineers $19,264,000
5 KJWW / TTG $16,943,913
6 Arup $15,856,593
7 Vanderweil Engineers $15,351,800
8 Simpson Gumpertz & Heger $13,586,000
9 Thornton Tomasetti $13,363,234
10 Dewberry $12,904,401
11 BR+A Consulting Engineers $11,400,000
12 RMF Engineering $11,354,900
13 Burns & McDonnell $11,116,604
14 BSA LifeStructures $10,770,801
15 P2S Engineering $10,557,369
16 Shive-Hattery $8,288,709
17 Jensen Hughes $7,740,346
18 Wiss, Janney, Elstner Associates $7,740,000
19 Fishbeck, Thompson, Carr & Huber $7,500,000
20 ME Engineers $6,460,000
21 Loring Consulting Engineers $6,036,000
22 H.F. Lenz Company $4,944,856
23 Interface Engineering $4,794,573
24 M/E Engineering $4,688,355
25 Ross & Baruzzini $4,307,200
26 Heapy Engineering $4,160,676
27 STV $4,002,342
28 RDK Engineers $3,875,821
29 Glumac $3,696,480
30 TLC Engineering for Architecture $3,491,531
31 Woolpert $3,243,901
32 JQ Engineering $3,141,800
33 Rist-Frost-Shumway Engineering $3,000,000
34 Spectrum Engineers $2,971,807
35 Karpinski Engineering $2,932,833
36 Smith Seckman Reid $2,842,841
37 Peter Basso Associates $2,780,856
38 Global Engineering Solutions $2,620,000
39 Stanley Consultants $2,463,846
40 Newcomb & Boyd $2,448,645
41 Bridgers & Paxton Consulting Engineers $2,427,726
42 Henderson Engineers $2,347,476
43 Primera Engineers $2,171,401
44 Environmental Systems Design $2,095,786
45 KCI Technologies $2,000,000
46 I. C. Thomasson Associates $1,928,200
47 dbHMS $1,920,000
48 Bala Consulting Engineers $1,880,000
49 Dunham Associates $1,750,000
50 Highland Associates $1,700,000
51 CJL Engineering, Inc. $1,510,260
52 Cardno Haynes Whaley $1,483,543
53 Syska Hennessy Group $1,445,519
54 Graef $1,357,546
55 DeSimone Consulting Engineers $1,305,742
56 Wallace Engineering $1,300,000
57 KZF Design $1,074,055
58 Luckett & Farley $1,069,453
59 William Tao & Associates $946,168
60 KLH Engineers $860,386
61 Baird, Hampton & Brown $841,665
62 Mazzetti $817,330
63 CTLGroup $800,000
64 Ghafari Associates $750,000
65 Wendel $745,424
66 OLA Consulting Engineers $672,728
67 JBA Consulting Engineers $668,293
68 Magnusson Klemencic Associates $626,415
69 SSOE Group $520,000
70 ThermalTech Engineering $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

| Feb 11, 2011

Grocery store anchors shopping center in Miami arts/entertainment district

18Biscayne is a 57,200-sf urban retail center being developed in downtown Miami by commercial real estate firm Stiles. Construction on the three-story center is being fast-tracked for completion in early 2012. The project is anchored by a 49,200-sf Publix market with bakery, pharmacy, and café with outdoor seating. An additional 8,000 sf of retail space will front Biscayne Boulevard. The complex is in close proximity to the Adrienne Arsht Center for the Performing Arts, the downtown Miami entertainment district, and the Omni neighborhood, one of the city’s fast-growing residential areas.

| Feb 11, 2011

Chicago architecture firm planning one of China’s tallest towers

Chicago-based Goettsch Partners was commissioned by developer Guangzhou R&F Properties Co. Ltd. to design a new 294,570-sm mixed-use tower in Tianjin, China. The Tianjin R&F Guangdong Tower will be located within the city’s newly planned business district, and at 439 meters it will be one of China’s tallest buildings. The massive complex will feature 134,900 sm of Class A office space, a 400-key, five-star hotel, 55 condominiums, and 8,550 sm of retail space. The architects are designing the tower with multi-story atriums and a high-performance curtain wall to bring daylight deep into the building, thereby creating deeper lease spans. The project is currently finishing design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021