flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 70 University Engineering Firms

Top 70 University Engineering Firms

AECOM, WSP | Parsons Brinckerhoff, and Jacobs top Building Design+Construction’s annual ranking of the nation’s largest university sector engineering and E/A firms, as reported in the 2016 Giants 300 Report.


By BD+C Staff | August 9, 2016

UW Health at The American Center, Madison, Wis. Photo: Steve Hall © Hedrich Blessing 2015, courtesy Flad Architects.

TOP 70 UNIVERSITY ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 AECOM $65,000,000
2 WSP | Parsons Brinckerhoff $37,988,000
3 Jacobs $31,600,000
4 Affiliated Engineers $19,264,000
5 KJWW / TTG $16,943,913
6 Arup $15,856,593
7 Vanderweil Engineers $15,351,800
8 Simpson Gumpertz & Heger $13,586,000
9 Thornton Tomasetti $13,363,234
10 Dewberry $12,904,401
11 BR+A Consulting Engineers $11,400,000
12 RMF Engineering $11,354,900
13 Burns & McDonnell $11,116,604
14 BSA LifeStructures $10,770,801
15 P2S Engineering $10,557,369
16 Shive-Hattery $8,288,709
17 Jensen Hughes $7,740,346
18 Wiss, Janney, Elstner Associates $7,740,000
19 Fishbeck, Thompson, Carr & Huber $7,500,000
20 ME Engineers $6,460,000
21 Loring Consulting Engineers $6,036,000
22 H.F. Lenz Company $4,944,856
23 Interface Engineering $4,794,573
24 M/E Engineering $4,688,355
25 Ross & Baruzzini $4,307,200
26 Heapy Engineering $4,160,676
27 STV $4,002,342
28 RDK Engineers $3,875,821
29 Glumac $3,696,480
30 TLC Engineering for Architecture $3,491,531
31 Woolpert $3,243,901
32 JQ Engineering $3,141,800
33 Rist-Frost-Shumway Engineering $3,000,000
34 Spectrum Engineers $2,971,807
35 Karpinski Engineering $2,932,833
36 Smith Seckman Reid $2,842,841
37 Peter Basso Associates $2,780,856
38 Global Engineering Solutions $2,620,000
39 Stanley Consultants $2,463,846
40 Newcomb & Boyd $2,448,645
41 Bridgers & Paxton Consulting Engineers $2,427,726
42 Henderson Engineers $2,347,476
43 Primera Engineers $2,171,401
44 Environmental Systems Design $2,095,786
45 KCI Technologies $2,000,000
46 I. C. Thomasson Associates $1,928,200
47 dbHMS $1,920,000
48 Bala Consulting Engineers $1,880,000
49 Dunham Associates $1,750,000
50 Highland Associates $1,700,000
51 CJL Engineering, Inc. $1,510,260
52 Cardno Haynes Whaley $1,483,543
53 Syska Hennessy Group $1,445,519
54 Graef $1,357,546
55 DeSimone Consulting Engineers $1,305,742
56 Wallace Engineering $1,300,000
57 KZF Design $1,074,055
58 Luckett & Farley $1,069,453
59 William Tao & Associates $946,168
60 KLH Engineers $860,386
61 Baird, Hampton & Brown $841,665
62 Mazzetti $817,330
63 CTLGroup $800,000
64 Ghafari Associates $750,000
65 Wendel $745,424
66 OLA Consulting Engineers $672,728
67 JBA Consulting Engineers $668,293
68 Magnusson Klemencic Associates $626,415
69 SSOE Group $520,000
70 ThermalTech Engineering $500,000

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

| Dec 13, 2010

Energy efficiency No. 1 priority for commercial office tenants

Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.

| Dec 7, 2010

Are green building RFPs more important than contracts?

The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021