flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top 80 Architecture/Engineering firms

Top 80 Architecture/Engineering firms

Stantec, HOK, and Callison RTKL once again top Building Design+Construction's 2016 ranking of the largest architecture/engineering firms in the United States. 


By BD+C Editors | July 26, 2016

CallisonRTKL served as architect for this Warren Clinic in Tulsa, Okla. Image: CallisonRTKL.

TOP 80 ARCHITECTURE/ENGINEERING FIRMS
Rank Firm 2015 Revenue
1 Stantec $579,413,704
2 HOK $450,824,000
3 CallisonRTKL $405,559,000
4 Skidmore, Owings & Merrill $352,332,272
5 HDR $314,800,000
6 SmithGroupJJR $222,085,339
7 CannonDesign $218,000,000
8 DLR Group $158,000,000
9 EYP $149,595,604
10 HGA $142,750,000
11 Page $139,000,000
12 NORR $137,488,821
13 Gresham, Smith and Partners $101,024,000
14 Leo A Daly $96,548,666
15 Nelson Worldwide Holdings $79,872,131
16 Flad Architects $74,100,000
17 EwingCole $65,754,000
18 LPA $64,063,658
19 Clark Nexsen $63,701,392
20 BRPH $63,095,404
21 Harley Ellis Devereaux $63,000,000
22 Ware Malcomb $62,861,465
23 PBK $62,400,000
24 Huckabee $60,544,770
25 CTA Architects Engineers $56,540,243
26 RSP Architects $54,613,000
27 RS&H $54,000,000
28 GreenbergFarrow $53,134,312
29 Little $49,406,000
30 Ballinger $47,381,276
31 Moseley Architects $43,618,103
32 S/L/A/M Collaborative, The $40,950,000
33 Morris Architects $40,700,000
34 Westlake Reed Leskosky $40,210,398
35 Heery International $36,368,516
36 WD Partners $36,123,000
37 Wold Architects and Engineers $35,800,000
38 Parkhill, Smith & Cooper $35,733,070
39 Lawrence Group $33,275,000
40 HNTB Corporation $31,894,668
41 Goodwyn, Mills and Cawood $30,704,308
42 Bergmann Associates $28,865,335
43 Environetics $27,973,007
44 Paulus, Sokolowski and Sartor $27,380,000
45 FXFOWLE $26,881,440
46 SMMA | Symmes Maini & McKee Associates $26,523,596
47 FreemanWhite $25,681,732
48 Integrus Architecture $24,284,055
49 Guernsey $23,062,942
50 Alliiance $22,507,000
51 KSQ Design $21,148,806
52 Epstein $19,600,000
53 Fanning/Howey Associates $19,167,566
54 Schenkel & Shultz $18,774,000
55 LK Architecture $17,640,000
56 Baskervill $15,538,552
57 Albert Kahn Associates $15,500,000
58 Sargenti Architects $15,450,000
59 Nadel $15,016,519
60 Becker Morgan Group $14,500,530
61 CASCO $14,450,000
62 Herschman Architects $14,077,722
63 Rosser International $13,067,871
64 Anderson Mikos Architects $12,866,000
65 Wright Heerema Architects $11,500,000
66 Barge Waggoner Sumner & Cannon $11,425,000
67 DLA Architects $9,603,058
68 Hoffmann Architects $8,988,750
69 DLA+ Architecture & Interior Design $8,842,000
70 GSB $7,801,562
71 Jonathan Nehmer + Associates $7,592,298
72 Larson Design Group $7,534,381
73 BBS Architects and Engineers $7,010,000
74 ACAI Associates $6,780,000
75 John Ciardullo Associates $6,682,132
76 ai Design Group $6,407,028
77 Emersion Design $6,355,288
78 TK Architects International $5,314,888
79 DAG Architects $4,500,000
80 Jencen Architecture $4,000,000
81 NewStudio Architecture $3,950,000
82 Convergence Design $1,234,000
83 GRW $1,233,162

 

 

RETURN TO THE GIANTS 300 LANDING PAGE

Related Stories

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021