Rank | Company | 2012 BIM Revenue ($) |
1 | Jacobs Engineering Group | $4,465,746,000 |
2 | URS Corp. | $292,864,749 |
3 | Science Applications International Corp. | $131,066,235 |
4 | Arup | $123,364,028 |
5 | Merrick & Co. | $106,000,000 |
6 | SSOE Group | $99,560,561 |
7 | Thornton Tomasetti | $93,431,545 |
8 | Buro Happold Consulting Engineers | $78,006,000 |
9 | Middough | $60,000,000 |
9 | KPFF Consulting Engineers | $60,000,000 |
11 | KJWW Engineering Consultants | $51,092,154 |
12 | Clark Nexsen | $37,364,300 |
13 | Vanderweil Engineers | $32,858,900 |
14 | Bard, Rao + Athanas Consulting Engineers | $32,000,000 |
15 | Magnusson Klemencic Associates | $31,843,000 |
16 | Henderson Engineers | $31,742,887 |
17 | Glumac | $30,116,000 |
18 | Walter P Moore | $29,092,693 |
19 | Affiliated Engineers | $28,907,000 |
20 | M-E Engineers | $28,500,000 |
21 | H&A Architects & Engineers | $27,734,657 |
22 | Michael Baker Jr. | $25,900,000 |
23 | Degenkolb Engineers | $23,647,736 |
24 | TLC Engineering for Architecture | $22,700,613 |
25 | Heapy Engineering | $21,674,602 |
26 | STV | $21,051,000 |
27 | Haynes Whaley Associates | $19,740,185 |
28 | CCRD Partners | $19,000,000 |
29 | TTG | $18,395,200 |
30 | Syska Hennessy Group | $18,015,883 |
31 | Smith Seckman Reid | $18,000,000 |
32 | Paulus, Sokolowski and Sartor | $15,200,000 |
33 | Environmental Systems Design | $14,338,994 |
34 | GRAEF | $12,600,000 |
35 | Interface Engineering | $10,772,782 |
36 | BRPH | $10,136,212 |
37 | Rist-Frost-Shumway Engineering | $8,000,000 |
37 | Barge, Waggoner, Sumner and Cannon | $8,000,000 |
39 | M/E Engineering | $7,500,000 |
40 | Newcomb & Boyd | $6,331,085 |
41 | Dunham Associates | $6,000,000 |
42 | Bridgers & Paxton Consulting Engineers | $5,735,421 |
43 | Bergmann Associates | $5,500,000 |
43 | Simpson Gumpertz & Heger | $5,500,000 |
45 | Dewberry | $5,412,709 |
46 | CJL Engineering | $5,197,143 |
47 | Peter Basso Associates | $5,000,000 |
48 | Zak Companies | $4,543,488 |
49 | H.F. Lenz | $4,050,000 |
50 | Wallace Engineering | $4,000,000 |
50 | Hixson Architecture, Engineering, Interiors | $4,000,000 |
52 | KLH Engineers | $3,518,208 |
53 | Coffman Engineers | $3,000,000 |
54 | Ross & Baruzzini | $2,407,000 |
55 | Sparling | $2,156,592 |
56 | Wick Fisher White | $2,113,000 |
57 | AKF Group | $2,000,000 |
58 | RDK Engineers | $1,985,000 |
59 | GHT Limited | $1,600,000 |
60 | P2S Engineering | $1,452,000 |
61 | RMF Engineering Design | $1,250,000 |
62 | Brinjac Engineering | $1,224,543 |
63 | Aon Fire Protection Engineering | $1,000,000 |
64 | Mazzetti | $714,544 |
65 | ThermalTech Engineering | $500,000 |
66 | FBA Engineering | $500,000 |
67 | GRW | $462,300 |
68 | Bala Consulting Engineers | $400,000 |
69 | Primera Engineers | $393,000 |
70 | Walker Parking Consultants | $380,361 |
71 | Apogee Consulting Group | $309,000 |
72 | KCI Technologies | $255,000 |
73 | Kamm Consulting | $113,494 |
74 | Allen & Shariff | $112,000 |
75 | G&W Engineering | $60,000 |
Back to BIM Giants article
Read the full 2013 Giants 300 Report
Related Stories
Contractors | Sep 30, 2015
FMI: Construction in place on track for sustained growth through 2016
FMI’s latest report singles out manufacturing, lodging, and office sectors as the drivers of nonresidential building activity and investment.
Reconstruction & Renovation | Sep 29, 2015
What went wrong? Diagnosing building envelope distress [AIA course]
With so many diverse components contributing to building envelope assemblies, it can be challenging to determine which of these myriad elements was the likely cause of a failure.
Architects | Sep 24, 2015
Supertall buildings vie for dominance along Chicago’s skyline
The latest proposals pit designs by Rafael Viñoly, Jeanne Gang, and Helmut Jahn.
Architects | Sep 24, 2015
From Gehry to the High Line: What makes a project a game-changer?
Each year, there are a handful of projects that significantly advance the AEC industry or a particular building type. Send us your game-changing projects for BD+C’s January 2016 special report.
Cultural Facilities | Sep 24, 2015
Bakpak Architects' 'pottery courtyard' concept in Poland incorporates local heritage
The multifunctional building proposed for Rzeszow, Poland, looks like it was handcrafted on a potter’s wheel.
Modular Building | Sep 23, 2015
SOM and DOE unveil 3D-printed, off-the-grid building
The Additive Manufacturing Integrated Energy (AMIE) building features a high-performance shell with a photovoltaic roof and built-in natural gas generator.
Airports | Sep 23, 2015
JFK Airport's dormant TWA terminal will be reborn as a hotel
After 15 years of disuse, the Googie architecture-inspired TWA Flight Center at New York’s John F. Kennedy International Airport will be transformed into a hotel. Gizmodo reports that the city’s Port Authority chose a renovation proposal from Jet Blue this week.
Architects | Sep 23, 2015
Architecture billings dip in August, but no 'cause for concern' says AIA economist
The American Institute of Architects reported the August ABI score was 49.1, down from a mark of 54.7 in July. This score reflects a slight decrease in design services.
Sports and Recreational Facilities | Sep 21, 2015
Tokyo Olympic Stadium saga ends for Zaha Hadid
After resubmitting a bid, the firm will not design the main venue for the 2020 Olympics after all.
University Buildings | Sep 21, 2015
6 lessons in campus planning
For campus planning, focus typically falls on repairing the bricks and mortar without consideration of program priorities. Gensler's Pamela Delphenich offers helpful tips and advice.