flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top BIM Engineering Firms [2013 Giants 300 Report]

Top BIM Engineering Firms [2013 Giants 300 Report]

Jacobs, URS, SAIC top Building Design+Construction's 2013 ranking of the engineering and engineering/architecture firms with the most revenue from BIM-driven projects.


By BD+C Staff | July 19, 2013
Courtesy SmithGroup
Courtesy SmithGroup
Rank Company 2012 BIM Revenue ($)
1 Jacobs Engineering Group $4,465,746,000
2 URS Corp. $292,864,749
3 Science Applications International Corp. $131,066,235
4 Arup $123,364,028
5 Merrick & Co. $106,000,000
6 SSOE Group $99,560,561
7 Thornton Tomasetti $93,431,545
8 Buro Happold Consulting Engineers $78,006,000
9 Middough $60,000,000
9 KPFF Consulting Engineers $60,000,000
11 KJWW Engineering Consultants $51,092,154
12 Clark Nexsen $37,364,300
13 Vanderweil Engineers $32,858,900
14 Bard, Rao + Athanas Consulting Engineers $32,000,000
15 Magnusson Klemencic Associates $31,843,000
16 Henderson Engineers $31,742,887
17 Glumac $30,116,000
18 Walter P Moore $29,092,693
19 Affiliated Engineers $28,907,000
20 M-E Engineers $28,500,000
21 H&A Architects & Engineers $27,734,657
22 Michael Baker Jr. $25,900,000
23 Degenkolb Engineers $23,647,736
24 TLC Engineering for Architecture $22,700,613
25 Heapy Engineering $21,674,602
26 STV $21,051,000
27 Haynes Whaley Associates $19,740,185
28 CCRD Partners $19,000,000
29 TTG $18,395,200
30 Syska Hennessy Group $18,015,883
31 Smith Seckman Reid $18,000,000
32 Paulus, Sokolowski and Sartor $15,200,000
33 Environmental Systems Design $14,338,994
34 GRAEF $12,600,000
35 Interface Engineering $10,772,782
36 BRPH $10,136,212
37 Rist-Frost-Shumway Engineering $8,000,000
37 Barge, Waggoner, Sumner and Cannon $8,000,000
39 M/E Engineering $7,500,000
40 Newcomb & Boyd $6,331,085
41 Dunham Associates $6,000,000
42 Bridgers & Paxton Consulting Engineers $5,735,421
43 Bergmann Associates $5,500,000
43 Simpson Gumpertz & Heger $5,500,000
45 Dewberry $5,412,709
46 CJL Engineering $5,197,143
47 Peter Basso Associates $5,000,000
48 Zak Companies $4,543,488
49 H.F. Lenz $4,050,000
50 Wallace Engineering $4,000,000
50 Hixson Architecture, Engineering, Interiors $4,000,000
52 KLH Engineers $3,518,208
53 Coffman Engineers $3,000,000
54 Ross & Baruzzini $2,407,000
55 Sparling $2,156,592
56 Wick Fisher White $2,113,000
57 AKF Group $2,000,000
58 RDK Engineers $1,985,000
59 GHT Limited $1,600,000
60 P2S Engineering $1,452,000
61 RMF Engineering Design $1,250,000
62 Brinjac Engineering $1,224,543
63 Aon Fire Protection Engineering $1,000,000
64 Mazzetti $714,544
65 ThermalTech Engineering $500,000
66 FBA Engineering $500,000
67 GRW $462,300
68 Bala Consulting Engineers $400,000
69 Primera Engineers $393,000
70 Walker Parking Consultants $380,361
71 Apogee Consulting Group $309,000
72 KCI Technologies $255,000
73 Kamm Consulting $113,494
74 Allen & Shariff $112,000
75 G&W Engineering $60,000

 

Back to BIM Giants article

 

Read the full 2013 Giants 300 Report

Related Stories

| Nov 12, 2014

Designs by three finalists for new Beethoven concert hall unveiled

David Chipperfield and Valentiny are among the finalists for a new concert hall being built to commemorate Beethoven’s 250th birthday in his hometown of Bonn, Germany.

| Nov 12, 2014

Forbes: Houston is America's #1 construction hotspot

A new list of America's 20 biggest boomtowns shows Houston on top, with New York City close behind, followed by Dallas, Washington, D.C., and Los Angeles.

| Nov 11, 2014

Must see: Artist pairs up Hollywood icons with famous modern architecture

In his latest series, Federico Babina illustrated 17 iconic Hollywood personalities, from Marilyn Monroe to Michael Caine, interacting with famous 20th century homes. 

| Nov 11, 2014

Renzo Piano's third building at London Bridge Quarter approved, will be built adjacent to the Shard

Renzo Piano Building Workshop has been granted planning approval for its residential building at London Bridge Quarter—a 26-story apartment tower dubbed Feilden House.

| Nov 10, 2014

5 guiding principles for solving airflow issues in open-plenum office spaces

Although architecturally appealing, exposed ceilings can create unwanted drafts and airflow problems if not engineered correctly. McGuire Engineers' Bill Stangeland offers tips for avoiding airflow issues on these projects.

| Nov 10, 2014

Clemson, Parsons architecture education programs honored for innovation, long-term impact

The architecture programs at Parsons The New School for Design and Clemson University have been selected as 2014 NCARB Award recipients for developing innovative curricula that merge practice and education. 

| Nov 10, 2014

Herzog & De Meuron unveils plan for National Library of Israel

The library’s new home will be a completely new building in Jerusalem, and will combine the functions of a central research center, a venue for indoor and outdoor cultural and educational activities, and a place for digital experience.

| Nov 10, 2014

Hotel construction pipeline hits five-year high

The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports. 

| Nov 7, 2014

Arts college uses creative financing to build 493-bed student housing

Many states have cut back funding for higher education in recent years, and securing money for new housing has been tougher than ever for many colleges and universities. A recent residence hall project in Boston involving three colleges provides an inspiring example of how necessity can spawn invention in financing strategies.

| Nov 7, 2014

Prefab helps Valparaiso student residence project meet an ambitious deadline

Few colleges or universities have embraced prefabrication more wholeheartedly than Valparaiso (Ind.) University. The Lutheran-based institution completed a $27 million residence hall this past summer in which the structural elements were all precast.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021