flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Data Center Engineering Firms [2014 Giants 300 Report]

Top Data Center Engineering Firms [2014 Giants 300 Report]

Fluor, Jacobs, and Syska Hennessy top Building Design+Construction's 2014 ranking of the largest data center engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 27, 2014
Rank Company 2013 Data Center Revenue
1 Fluor Corporation $243,370,000
2 Jacobs 47,490,000
3 Syska Hennessy Group 41,934,230
4 URS Corp. 25,100,000
5 Vanderweil Engineers 21,588,000
6 Integrated Design Group 13,574,682
7 Parsons Brinckerhoff 12,185,435
8 Environmental Systems Design 10,063,915
9 Arup 9,997,297
10 Highland Associates 8,400,000
11 AKF Group 7,965,000
12 Dewberry 6,640,874
13 Glumac 6,541,483
14 H.F. Lenz 4,500,000
15 Leidos 4,160,000
16 Bala Consulting Engineers 3,192,000
17 Henderson Engineers 2,782,839
18 H&A Architects & Engineers 2,700,000
19 RMF Engineering 2,500,000
20 Zak Companies 2,414,034
21 Wick Fisher White 1,629,917
22 Sparling 1,626,044
23 GHT Limited 1,575,000
24 TLC Engineering for Architecture 1,531,865
25 Newcomb & Boyd 1,340,931
26 Affiliated Engineers 1,323,000
27 RDK Engineers 1,190,000
28 Thornton Tomasetti 1,138,961
29 CRB  1,013,150
30 Dunham Associates 1,000,000
31 Joseph R. Loring & Associates 1,000,000
32 Karpinski Engineering 951,142
33 Bridgers & Paxton Consulting Engineers 843,476
34 KPFF Consulting Engineers 800,000
35 Heapy Engineering 774,965
36 Aon Fire Protection Engineering Corp. 700,000
37 WSP Group 660,000
38 Mazzetti 494,741
39 Martin/Martin 425,141
40 TTG 351,000
41 KJWW Engineering Consultants 325,576
42 Ross & Baruzzini 318,908
43 I. C. Thomasson Associates 300,000
44 Wiss, Janney, Elstner Associates 270,000
45 CJL Engineering 247,750
46 Total Building Commissioning 246,795
47 STV 217,000
48 ThermalTech Engineering 150,000
49 Paulus, Sokolowski and Sartor 150,000
50 Barge Waggoner Sumner & Cannon 150,000
51 Coffman Engineers 120,000
52 GRW 101,332
53 Wallace Engineering 69,000
54 Spectrum Engineers 65,186
55 Allen & Shariff 65,000
56 P2S Engineering 52,770
57 Interface Engineering 47,004
58 Kamm Consulting 39,350
59 SSOE Group 17,189
60 Brinjac Engineering 10,480

 

Read the Data Center Giants article   

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

Codes and Standards | Jul 15, 2024

New York City code update changes definition of a major building

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors. On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

Adaptive Reuse | Jul 12, 2024

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

University Buildings | Jul 11, 2024

3 considerations for designing healthy, adaptable student dining

Amanda Vigneau, IIDA, NCDIQ, LEED ID+C, Director, Shepley Bulfinch, shares three ways student dining facilities have evolved to match changes in student life.

Healthcare Facilities | Jul 11, 2024

New download: BD+C's 2024 Healthcare Annual Report

Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This free 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.

Transit Facilities | Jul 10, 2024

Historic Fresno train depot to be renovated for California high speed rail station project

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

Government Buildings | Jul 8, 2024

GSA adopts new accessibility guidelines for federal properties

The U.S. General Services Administration (GSA) adopted a new rule with new accessibility guidelines for federal buildings. The rule establishes that pedestrian facilities in the public right-of-way are readily accessible to and usable by people with disabilities. 

Office Buildings | Jul 8, 2024

Office vacancy peak of 22% to 28% forecasted for 2026

The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.

Virtual Reality | Jul 8, 2024

Can a VR-enabled AEC firm transform your project?

With the aid of virtual reality and three-dimensional visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Green | Jul 8, 2024

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.

Codes and Standards | Jul 8, 2024

New York State building code update would ban fossil fuels in new buildings

New York’s Building Code Council is set to include the All-Electric Buildings Act in its 2025 code update. The Act would ban natural gas and other fossil fuels in new buildings. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021