Rank Company 2012 Total Revenue ($)
1 Fluor $221,231,200
2 Arup $149,738,587
3 Affiliated Engineers $105,503,000
4 WSP USA $105,362,352
5 KPFF Consulting Engineers $91,000,000
6 Syska Hennessy Group $82,097,502
7 Henderson Engineers $63,485,775
8 Smith Seckman Reid $52,919,312
9 KJWW Engineering Consultants $51,092,154
10 Vanderweil Engineers $50,552,200
11 TTG $49,968,167
12 Glumac $47,967,000
13 Bard, Rao + Athanas Consulting Engineers $41,500,000
14 Rolf Jensen & Associates $40,000,000
15 Coffman Engineers $39,100,000
16 Environmental Systems Design $38,763,000
17 Magnusson Klemencic Associates $37,462,767
18 M-E Engineers $35,400,000
19 TLC Engineering for Architecture $34,295,957
20 RMF Engineering Design $32,300,000
21 RDK Engineers $31,201,000
22 Walter P Moore $29,092,693
23 H.F. Lenz $26,991,500
24 Interface Engineering $25,193,936
25 Degenkolb Engineers $25,127,432
26 CCRD Partners 25,100,000
27 Mazzetti 24,895,804
28 Robins & Morton 24,500,000
29 M/E Engineering 22,687,000
30 Aon Fire Protection Engineering 22,510,728
31 Heapy Engineering 22,116,941
32 Sparling 20,282,073
33 Haynes Whaley Associates 19,907,949
34 Newcomb & Boyd 18,617,195
35 KCI Technologies 18,032,000
36 Bridgers & Paxton Consulting Engineers 16,868,884
37 GHT Limited 16,834,469
38 Bala Consulting Engineers 16,430,000
39 French & Parrello Associates 15,903,300
40 ThermalTech Engineering 15,500,000
41 Joseph R. Loring & Associates 15,000,000
42 KLH Engineers 14,072,830
43 Dunham Associates 14,000,000
44 Wallace Engineering 13,350,000
45 P2S Engineering 12,962,044
46 Karpinski Engineering 12,076,943
47 Peter Basso Associates 11,016,000
48 Rist-Frost-Shumway Engineering 9,300,000
49 CTLGroup 9,000,000
50 Allen & Shariff 8,500,000
51 Wick Fisher White 8,126,951
52 Brinjac Engineering 6,890,645
53 OLA Consulting Engineers 5,500,000
54 Eaton Energy Solutions 4,430,095
55 Kamm Consulting 3,681,775
56 FBA Engineering 3,360,000
57 Apogee Consulting Group 3,331,300
58 G&W Engineering 2,408,800
59 Total Building Commissioning 616,878
60 Yates Cos., The 400,000
61 Weis Builders 300,000

 

Tags

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021