flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Healthcare Sector Engineering Firms [2013 Giants 300 Report]

Top Healthcare Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Jacobs, URS top Building Design+Construction's 2013 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S. 


By BD+C Staff | July 30, 2013
The Benjamin Russell Hospital for Children, Birmingham, Ala. The Building Team i
The Benjamin Russell Hospital for Children, Birmingham, Ala. The Building Team includes: HKS and Giattina Aycock Architecture (architects); KLMK (program manager); Hoar Construction and BE&K Construction Group (contractors); CCRD Partners (MEP engineer); HKS (structural engineer); Walter Schoal Engineering (civil engineer). Photo: HKS, Blake Marvin
Rank Company 2012 Healthcare Revenue ($)
1 AECOM Technology Corp. $180,210,000
2 Jacobs Engineering Group $77,100,000
3 URS Corp. $43,327,332
4 Smith Seckman Reid $40,105,600
5 KPFF Consulting Engineers $30,000,000
6 Affiliated Engineers $28,217,000
7 TTG $24,719,905
8 Parsons Brinckerhoff $22,700,000
9 Dewberry $21,226,702
10 Allen & Shariff $20,300,000
11 Bard, Rao + Athanas Consulting Engineers $19,000,000
12 KJWW Engineering Consultants $18,937,680
13 Mazzetti $18,293,579
14 Degenkolb Engineers $18,070,782
15 CCRD Partners $18,000,000
16 Burns & McDonnell $16,375,000
17 TLC Engineering for Architecture $13,500,933
18 Syska Hennessy Group $11,495,282
19 AKF Group $10,770,000
20 Arup $9,244,250
21 Shive-Hattery $8,381,840
22 Heapy Engineering $8,159,633
23 Zak Companies $7,640,496
24 M-E Engineers $7,200,000
24 RMF Engineering Design $7,200,000
26 Thornton Tomasetti $6,858,953
27 Sparling $6,768,165
28 Buro Happold Consulting Engineers $6,520,000
29 Rolf Jensen & Associates $6,400,000
30 Walter P Moore $6,232,472
31 Michael Baker Jr. $6,200,000
32 SSOE Group $6,192,909
33 Simpson Gumpertz & Heger $5,700,000
34 M/E Engineering $5,671,750
35 Wiss, Janney, Elstner Associates $5,390,000
36 Dunham Associates $5,000,000
37 Vanderweil Engineers $4,846,600
38 Interface Engineering $4,633,068
39 RDK Engineers $4,572,000
40 Karpinski Engineering $4,438,224
41 Clark Nexsen $4,167,051
42 Peter Basso Associates $4,066,000
43 Aon Fire Protection Engineering $4,000,728
44 H.F. Lenz $3,983,000
45 Newcomb & Boyd $3,942,400
46 Bridgers & Paxton Consulting Engineers $3,879,844
47 STV $3,735,000
48 Walker Parking Consultants $3,719,693
49 Science Applications International Corp. $3,621,708
50 Eaton Energy Solutions $3,502,239
51 KCI Technologies $3,500,000
52 Coffman Engineers $3,350,000
53 Spectrum Engineers $3,338,950
54 Glumac $3,296,000
55 WSP USA $2,411,684
56 CJL Engineering $2,390,686
57 Environmental Systems Design $2,383,822
58 KLH Engineers $2,100,000
59 Rist-Frost-Shumway Engineering $2,000,000
60 Apogee Consulting Group $1,582,000
61 Ross & Baruzzini $1,505,511
62 Henderson Engineers $1,469,261
63 Brinjac Engineering $1,367,836
64 GRAEF $1,335,473
65 ThermalTech Engineering $1,300,000
66 Haynes Whaley Associates $1,226,927
67 Bergmann Associates $1,177,000
68 Wick Fisher White $1,137,773
69 Magnusson Klemencic Associates $1,053,699
70 Bala Consulting Engineers $850,000
71 OLA Consulting Engineers $750,000
72 CTLGroup $700,000
72 French & Parrello Associates $700,000
74 Primera Engineers $620,000
75 FBA Engineering $400,000
76 Joseph R. Loring & Associates $280,000
77 G&W Engineering $232,000
78 Wallace Engineering $225,000
79 Stanley Consultants $219,880
80 Davis, Bowen & Friedel $187,632
81 Paulus, Sokolowski and Sartor $150,000
82 P2S Engineering $76,079
83 Total Building Commissioning $46,144
84 Kamm Consulting $21,025
85 Guernsey $11,668

 

Read the Healthcare Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Daylighting | Aug 18, 2022

Lisa Heschong on 'Thermal and Visual Delight in Architecture'

Lisa Heschong, FIES, discusses her books, "Thermal Delight in Architecture" and "Visual Delight in Architecture," with BD+C's Rob Cassidy. 

| Aug 18, 2022

The Illinois Institute of Technology restores three Mies van der Rohe buildings

With Dirk Denison Architects and Gilbane Building Company, the Illinois Institute of Technology has recently completed a $70 million housing project that has restored three Ludwig Mies van der Rohe buildings.

Multifamily Housing | Aug 17, 2022

California strip mall goes multifamily residential

Tiny Tim Plaza started out as a gas station and a dozen or so stores. Now it’s a thriving mixed-use community, minus the gas station.

| Aug 17, 2022

Focusing on building envelope design and commissioning

Building envelope design is constantly evolving as new products and assemblies are developed.

| Aug 17, 2022

New York to deploy 30,000 window-sized electric heat pumps in city-owned apartments

New York officials recently announced the state and the city will invest $70 million to roll out 30,000 window-sized electric heat pumps in city-owned apartments.

| Aug 17, 2022

IBM’s former office buildings in Boca Raton turn into a modern tech campus

Built in 1968, the Boca Raton Innovation Campus (BRiC), at 1.7 million square feet, is the largest office campus in Florida.

| Aug 16, 2022

DOE funds 18 projects developing tech to enable buildings to store carbon

The Department of Energy announced $39 million in awards for 18 projects that are developing technologies to transform buildings into net carbon storage structures.

| Aug 16, 2022

Multifamily holds strong – for now

All leading indicators show that the multifamily sector is shrugging off rising interest rates, inflationary pressures and other economic challenges, and will continue to be a torrid market for design and construction firms for at least the rest of 2022.

| Aug 16, 2022

Cedars-Sinai Urgent Care Clinic’s high design for urgent care

The new Cedars-Sinai Los Feliz Urgent Care Clinic in Los Angeles plays against type, offering a stylized design to what are typically mundane, utilitarian buildings. 

| Aug 15, 2022

IF you build it, will they come? The problem of staff respite in healthcare facilities

Architects and designers have long argued for the value of respite spaces in healthcare facilities.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021