flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

AECOM, Jacobs, and URS Corp. top Building Design+Construction's 2014 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 23, 2014
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospit
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospital in Palos Heights, Ill., give patients ample s
Rank Company 2013 Healthcare Revenue
1 AECOM Technology Corp. 180,760,000
2 Jacobs 87,770,000
3 URS Corp. 45,036,525
4 Smith Seckman Reid 40,105,600
5 KPFF Consulting Engineers 38,000,000
6 Allen & Shariff 36,000,000
7 BR+A Consulting Engineers 29,900,000
8 Affiliated Engineers 27,947,000
9 CCRD Partners 23,760,000
10 Burns & McDonnell 19,810,000
11 Parsons Brinckerhoff 17,950,364
12 KJWW Engineering Consultants 17,848,081
13 Mazzetti 16,963,459
14 AKF Group 16,432,000
15 STV 16,419,000
16 TTG 15,224,500
17 Dewberry 15,179,608
18 Degenkolb Engineers 12,635,148
19 TLC Engineering for Architecture 11,667,359
20 Zak Companies 11,620,500
21 Syska Hennessy Group 10,910,770
22 Arup 10,609,311
23 Heapy Engineering 10,211,094
24 M-E Engineers 9,657,000
25 I. C. Thomasson Associates 9,400,000
26 Thornton Tomasetti 7,774,388
27 Shive-Hattery 7,686,286
28 RMF Engineering 7,100,000
29 Sparling 6,566,306
30 Wiss, Janney, Elstner Associates 6,240,000
31 RDK Engineers 5,500,000
32 Dunham Associates 5,500,000
33 Karpinski Engineering 5,307,808
34 M/E Engineering 5,163,876
35 SSOE Group 5,111,297
36 Simpson Gumpertz & Heger 5,110,000
37 Highland Associates 4,900,000
38 Vanderweil Engineers 4,566,200
39 KCI Technologies 4,500,000
40 Coffman Engineers 4,202,872
41 Environmental Systems Design 4,142,911
42 H.F. Lenz 4,050,740
43 Ross & Baruzzini 3,980,169
44 Interface Engineering 3,888,841
45 Newcomb & Boyd 3,651,012
46 Glumac 3,605,075
47 WSP Group 3,490,000
48 Bridgers & Paxton Consulting Engineers 3,326,881
49 CJL Engineering 3,093,720
50 Henderson Engineers 3,042,727
51 Aon Fire Protection Engineering Corp. 3,000,000
52 KLH Engineers 2,168,871
53 Graef 2,092,951
54 Apogee Consulting Group 2,080,275
55 Primera Engineers 2,032,000
56 Martin/Martin 1,693,693
57 DeSimone Consulting Engineers 1,693,478
58 Spectrum Engineers 1,664,669
59 Brinjac Engineering 1,299,629
60 Wick Fisher White 1,027,071
61 Wallace Engineering 853,000
62 Magnusson Klemencic Associates 809,347
63 Bala Consulting Engineers 687,000
64 Walter P Moore and Associates 683,315
65 Fishbeck, Thompson, Carr & Huber 600,000
66 Davis, Bowen & Friedel 590,125
67 P2S Engineering 557,346
68 OLA Consulting Engineers 492,000
69 Joseph R. Loring & Associates 480,000
70 CTLGroup 410,000
71 Rist-Frost-Shumway Engineering 400,000
72 French & Parrello Associates 385,000
73 ThermalTech Engineering 350,000
74 G&W Engineering Corp. 191,800
75 Paulus, Sokolowski and Sartor 180,000
76 Leidos 170,000
77 Stanley Consultants 157,889
78 Total Building Commissioning 135,837
79 GHT Limited 100,000
80 H&A Architects & Engineers 75,000
81 GRW 53,200
82 Kamm Consulting 51,660
83 Guernsey 5,361

 

Read the Healthcare Giants article

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

| Feb 11, 2011

Justice center on Fall River harbor serves up daylight, sustainable elements, including eucalyptus millwork

Located on historic South Main Street in Fall River, Mass., the Fall River Justice Center opened last fall to serve as the city’s Superior and District Courts building. The $85 million facility was designed by Boston-based Finegold Alexander + Associates Inc., with Dimeo Construction as CM and Arup as MEP. The 154,000-sf courthouse contains nine courtrooms, a law library, and a detention area. Most of the floors have the same ceiling height, which will makes them easier to reconfigure in the future as space needs change. Designed to achieve LEED Silver, the facility’s elliptical design offers abundant natural daylight and views of the harbor. Renewable eucalyptus millwork is one of the sustainable features.

| Feb 11, 2011

Research facility separates but also connects lab spaces

California State University, Northridge, consolidated its graduate and undergraduate biology and mathematics programs into one 90,000-sf research facility. Architect of record Cannon Design worked on the new Chaparral Hall, creating a four-story facility with two distinct spaces that separate research and teaching areas; these are linked by faculty offices to create collaborative spaces. The building houses wet research, teaching, and computational research labs, a 5,000-sf vivarium, classrooms, and administrative offices. A four-story outdoor lobby and plaza and an outdoor staircase provide orientation. A covered walkway links the new facility with the existing science complex. Saiful/Bouquet served as structural engineer, Bard, Rao + Athanas Consulting Engineers served as MEP, and Research Facilities Design was laboratory consultant.

| Feb 11, 2011

A feast of dining options at University of Colorado community center, but hold the buffalo stew

The University of Colorado, Boulder, cooked up something different with its new $84.4 million Center for Community building, whose 900-seat foodservice area consists of 12 micro-restaurants, each with its own food options and décor. Centerbrook Architects of Connecticut collaborated with Denver’s Davis Partnership Architects and foodservice designer Baker Group of Grand Rapids, Mich., on the 323,000-sf facility, which also includes space for a career center, international education, and counseling and psychological services. Exterior walls of rough-hewn, variegated sandstone and a terra cotta roof help the new facility blend with existing campus buildings. Target: LEED Gold.

| Feb 11, 2011

Chicago high-rise mixes condos with classrooms for Art Institute students

The Legacy at Millennium Park is a 72-story, mixed-use complex that rises high above Chicago’s Michigan Avenue. The glass tower, designed by Solomon Cordwell Buenz, is mostly residential, but also includes 41,000 sf of classroom space for the School of the Art Institute of Chicago and another 7,400 sf of retail space. The building’s 355 one-, two-, three-, and four-bedroom condominiums range from 875 sf to 9,300 sf, and there are seven levels of parking. Sky patios on the 15th, 42nd, and 60th floors give owners outdoor access and views of Lake Michigan.

| Feb 11, 2011

Iowa surgery center addresses both inpatient and outpatient care

The 12,000-person community of Carroll, Iowa, has a new $28 million surgery center to provide both inpatient and outpatient care. Minneapolis-based healthcare design firm Horty Elving headed up the four-story, 120,000-sf project for St. Anthony’s Regional Hospital. The center’s layout is based on a circular process flow, and includes four 800-sf operating rooms with poured rubber floors to reduce leg fatigue for surgeons and support staff, two substerile rooms between each pair of operating rooms, and two endoscopy rooms adjacent to the outpatient prep and recovery rooms. Recovery rooms are clustered in groups of four. The large family lounge (left) has expansive windows with views of the countryside, and television monitors that display coded information on patient status so loved ones can follow a patient’s progress.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021