AECOM, Jacobs, and URS Corp. top Building Design+Construction's 2014 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 23, 2014
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospit
Single-bed inpatient rooms in the Hospitaller Pavilion at Palos Community Hospital in Palos Heights, Ill., give patients ample s
Rank Company 2013 Healthcare Revenue
1 AECOM Technology Corp. 180,760,000
2 Jacobs 87,770,000
3 URS Corp. 45,036,525
4 Smith Seckman Reid 40,105,600
5 KPFF Consulting Engineers 38,000,000
6 Allen & Shariff 36,000,000
7 BR+A Consulting Engineers 29,900,000
8 Affiliated Engineers 27,947,000
9 CCRD Partners 23,760,000
10 Burns & McDonnell 19,810,000
11 Parsons Brinckerhoff 17,950,364
12 KJWW Engineering Consultants 17,848,081
13 Mazzetti 16,963,459
14 AKF Group 16,432,000
15 STV 16,419,000
16 TTG 15,224,500
17 Dewberry 15,179,608
18 Degenkolb Engineers 12,635,148
19 TLC Engineering for Architecture 11,667,359
20 Zak Companies 11,620,500
21 Syska Hennessy Group 10,910,770
22 Arup 10,609,311
23 Heapy Engineering 10,211,094
24 M-E Engineers 9,657,000
25 I. C. Thomasson Associates 9,400,000
26 Thornton Tomasetti 7,774,388
27 Shive-Hattery 7,686,286
28 RMF Engineering 7,100,000
29 Sparling 6,566,306
30 Wiss, Janney, Elstner Associates 6,240,000
31 RDK Engineers 5,500,000
32 Dunham Associates 5,500,000
33 Karpinski Engineering 5,307,808
34 M/E Engineering 5,163,876
35 SSOE Group 5,111,297
36 Simpson Gumpertz & Heger 5,110,000
37 Highland Associates 4,900,000
38 Vanderweil Engineers 4,566,200
39 KCI Technologies 4,500,000
40 Coffman Engineers 4,202,872
41 Environmental Systems Design 4,142,911
42 H.F. Lenz 4,050,740
43 Ross & Baruzzini 3,980,169
44 Interface Engineering 3,888,841
45 Newcomb & Boyd 3,651,012
46 Glumac 3,605,075
47 WSP Group 3,490,000
48 Bridgers & Paxton Consulting Engineers 3,326,881
49 CJL Engineering 3,093,720
50 Henderson Engineers 3,042,727
51 Aon Fire Protection Engineering Corp. 3,000,000
52 KLH Engineers 2,168,871
53 Graef 2,092,951
54 Apogee Consulting Group 2,080,275
55 Primera Engineers 2,032,000
56 Martin/Martin 1,693,693
57 DeSimone Consulting Engineers 1,693,478
58 Spectrum Engineers 1,664,669
59 Brinjac Engineering 1,299,629
60 Wick Fisher White 1,027,071
61 Wallace Engineering 853,000
62 Magnusson Klemencic Associates 809,347
63 Bala Consulting Engineers 687,000
64 Walter P Moore and Associates 683,315
65 Fishbeck, Thompson, Carr & Huber 600,000
66 Davis, Bowen & Friedel 590,125
67 P2S Engineering 557,346
68 OLA Consulting Engineers 492,000
69 Joseph R. Loring & Associates 480,000
70 CTLGroup 410,000
71 Rist-Frost-Shumway Engineering 400,000
72 French & Parrello Associates 385,000
73 ThermalTech Engineering 350,000
74 G&W Engineering Corp. 191,800
75 Paulus, Sokolowski and Sartor 180,000
76 Leidos 170,000
77 Stanley Consultants 157,889
78 Total Building Commissioning 135,837
79 GHT Limited 100,000
80 H&A Architects & Engineers 75,000
81 GRW 53,200
82 Kamm Consulting 51,660
83 Guernsey 5,361

 

Read the Healthcare Giants article

 

Read BD+C's full 2014 Giants 300 Report

Related Stories

| Nov 9, 2010

Designing a library? Don’t focus on books

How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.

| Nov 9, 2010

Turner Construction report: Green buildings still on the agenda

Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Nov 3, 2010

First of three green labs opens at Iowa State University

Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Nov 3, 2010

Seattle University’s expanded library trying for LEED Gold

Pfeiffer Partners Architects, in collaboration with Mithun Architects, programmed, planned, and designed the $55 million renovation and expansion of Lemieux Library and McGoldrick Learning Commons at Seattle University. The LEED-Gold-designed facility’s green features include daylighting, sustainable and recycled materials, and a rain garden.

| Nov 3, 2010

Recreation center targets student health, earns LEED Platinum

Not only is the student recreation center at the University of Arizona, Tucson, the hub of student life but its new 54,000-sf addition is also super-green, having recently attained LEED Platinum certification.

| Nov 3, 2010

New church in Connecticut will serve a growing congregation

Tocci Building Companies will start digging next June for the Black Rock Congregational Church in Fairfield, Conn. Designed by Wiles Architects, the 103,000-sf multiuse facility will feature a 900-person worship center with tiered stadium seating, a children’s worship center, a chapel, an auditorium, a gymnasium, educational space, administrative offices, commercial kitchen, and a welcome center with library and lounge.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021