Top Hotel Engineering Firms [2013 Giants 300 Report]

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff
Grand Hyatt Beijing Hotel, Beijing, China; Courtesy: Parsons Brinckerhoff

 

 

 

 

 

 

 

 

Rank Company 2012 Hospitality Revenue ($)
1 AECOM Technology Corp. $100,190,000
2 Parsons Brinckerhoff $28,900,000
3 Buro Happold Consulting Engineers $16,165,000
4 Rolf Jensen & Associates $7,600,000
5 Thornton Tomasetti $7,218,731
6 KPFF Consulting Engineers $6,000,000
7 Arup $5,527,371
8 Michael Baker Jr. $4,340,000
9 Wiss, Janney, Elstner Associates $2,880,000
10 WSP USA $2,696,642
11 Simpson Gumpertz & Heger $2,200,000
11 Aon Fire Protection Engineering $2,000,000
13 Clark Nexsen $1,450,223
14 Vanderweil Engineers $1,272,800
15 Glumac $1,252,000
16 Magnusson Klemencic Associates $1,239,089
17 Bala Consulting Engineers $1,200,000
18 M/E Engineering $1,134,350
19 TLC Engineering for Architecture $973,982
20 Environmental Systems Design $971,399
21 M-E Engineers $900,000
22 H&A Architects & Engineers $863,474
23 Paulus, Sokolowski and Sartor $750,000
24 AKF Group $739,000
25 KJWW Engineering Consultants $651,984
26 KLH Engineers $524,215
27 Walter P Moore $495,971
28 GHT Limited $450,000
29 Science Applications International Corp. $426,888
30 Interface Engineering $425,984
31 Allen & Shariff $400,000
32 Walker Parking Consultants $360,240
33 Bridgers & Paxton Consulting Engineers $337,378
34 Haynes Whaley Associates $301,003
35 CTLGroup $300,000
36 RDK Engineers $281,000
37 Henderson Engineers $272,858
38 H.F. Lenz $272,000
39 Smith Seckman Reid $270,470
40 Syska Hennessy Group $265,788
41 Primera Engineers $211,000
42 Coffman Engineers $200,000
43 Joseph R. Loring & Associates $155,000
44 Wallace Engineering $150,000
45 GRAEF $143,034
46 Dunham Associates $125,000
47 Karpinski Engineering $109,499
48 Barge, Waggoner, Sumner and Cannon $100,000
48 ThermalTech Engineering $100,000
50 Heapy Engineering $96,897
51 Spectrum Engineers $89,390
52 Newcomb & Boyd $87,850
53 TTG $85,000
54 Mazzetti $57,094
55 Sparling $40,399
56 Dewberry $33,605
57 FBA Engineering $30,000
58 Degenkolb Engineers $14,192
59 Davis, Bowen & Friedel $10,521
60 Kamm Consulting $3,500
61 Shive-Hattery $3,055
62 French & Parrello Associates $3,000

 

Read the Hotel Giants article 

 

Read BD+C's full Giants 300 Report

Related Stories

| Feb 23, 2012

Federal budget cuts put major building projects on hold

A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.

| Feb 23, 2012

Federal agencies fixed on leasing LEED-certified space

The federal government is especially focused on renting LEED-certified spaces.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 22, 2012

Siemens earns LEED certification for Maryland office

The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.

| Feb 22, 2012

CISCO recognizes Gilbane for quality construction, design, and safety

The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. 

| Feb 22, 2012

Perkins Eastman expands portfolio in China and Vietnam

Recent awards, project progress signal ongoing commitment to region.

| Feb 22, 2012

Suffolk awarded Boston post office renovation project

Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021