flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

Top K-12 School Sector Architecture Firms [2013 Giants 300 Report]

DLR, SHW top Building Design+Construction's 2013 ranking of the largest K-12 school sector architecture and architecture/engineering firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 K-12 Revenue ($)
1 DLR Group $38,250,000
2 SHW Group $32,328,843
3 PBK $31,760,000
4 IBI Group $27,977,860
5 HMC Architects $25,407,164
6 Stantec $21,586,209
7 Fanning/Howey Associates $20,247,000
8 Perkins+Will $19,938,211
9 Heery International $16,561,303
10 LPA $14,438,017
11 NTD Architecture $13,129,833
12 Perkins Eastman $13,050,000
13 Corgan $12,086,022
14 S/L/A/M Collaborative, The $11,581,000
15 NAC|Architecture $11,460,923
16 Moseley Architects $11,434,168
17 Fletcher-Thompson $9,620,000
18 FGM Architects $9,288,111
19 Leo A Daly $8,661,304
20 SMMA | Symmes Maini & McKee Associates $7,900,000
21 Wight & Co. $6,992,632
22 SEI Design Group $6,898,000
23 DLA Architects $5,999,790
24 SLATERPAULL Architects $5,726,536
25 Legat Architects $5,310,000
26 LS3P $5,111,880
27 Cuningham Group Architecture $4,866,792
28 Little $4,283,800
29 Ashley McGraw Architects $4,032,194
30 EwingCole $4,000,000
31 BBS Architects, Landscape Architects and Engineers $3,350,000
32 Harley Ellis Devereaux $3,134,000
33 Harvard Jolly Architecture $2,910,511
34 CTA Architects Engineers $2,868,705
35 Cooper Carry $2,856,159
36 Astorino $2,710,000
37 Goodwyn, Mills & Cawood $2,620,000
38 FXFOWLE Architects $2,610,644
39 Moody Nolan $2,500,000
40 Reynolds, Smith and Hills $2,180,000
41 Swanke Hayden Connell Asrchitects $2,000,000
42 GBBN Architects $1,600,000
43 Massa Montalto Architects $1,596,189
44 KZF Design $1,548,386
45 PGAL $1,520,000
46 Smallwood, Reynolds, Stewart, Stewart & Associates $1,490,039
47 Shepley Bulfinch Richardson & Abbott $1,413,440
48 Mithun $1,189,000
49 Environetics $1,188,686
50 HLW International $1,000,000
51 CASCO $940,000
52 Ennead Architects $880,000
53 Gensler $800,000
54 Sasaki Associates $797,830
55 Albert Kahn Family of Companies $687,568
56 HNTB Archtecture $629,682
57 CO Architects $629,000
58 OZ Architecture $565,653
59 Westlake Reed Leskosky $500,000
60 Good Fulton & Farrell $482,510
61 Rule Joy Trammell + Rubio $450,000
62 Kirksey Architecture $423,050
63 DesignGroup $408,989
64 LMN Architects $379,300
65 Hoffmann Architects $337,000
66 Morris Architects $300,000
66 Sherlock, Smith & Adams $300,000
68 Davis Brody Bond $279,429
69 TEG Architects - The Estopinal Group $278,901
70 RSP Architects $261,000
71 LawKingdon Architecture $250,000
72 JRS Architect $225,000
73 Nadel $218,464
74 Epstein $205,000
75 Adache Group Architects $200,000
76 VOA Associates $162,515
77 SRG Partnership $152,268
78 Ware Malcomb $75,000
79 Niles Bolton Associates $50,757
80 Hensley Lamkin Rachel $41,000
81 Omniplan Architects $34,217

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021