Rank Company 2012 K-12 Revenue ($)
1 AECOM Technology Corp. $100,150,000
2 URS Corp. $55,927,778
3 STV $45,937,000
4 Jacobs Engineering Group $36,550,000
5 Parsons Brinckerhoff $19,100,000
6 TTG $9,985,300
7 Shive-Hattery $7,379,425
8 BRPH $4,900,000
9 KCI Technologies $4,200,000
10 Dewberry $3,852,971
11 KJWW Engineering Consultants $3,643,844
12 Thornton Tomasetti $3,589,317
13 Wiss, Janney, Elstner Associates $3,570,000
14 Joseph R. Loring & Associates $3,500,000
15 KPFF Consulting Engineers $3,000,000
16 M/E Engineering $2,779,150
17 Interface Engineering $2,745,564
18 Simpson Gumpertz & Heger $2,700,000
19 CJL Engineering $2,507,621
20 Rist-Frost-Shumway Engineering $2,500,000
21 FBA Engineering $2,405,000
22 Allen & Shariff $2,200,000
23 Coffman Engineers $2,140,000
24 Heapy Engineering $2,086,975
25 Bridgers & Paxton Consulting Engineers $2,024,266
26 RDK Engineers $1,975,000
27 AKF Group $1,576,000
28 Vanderweil Engineers $1,553,500
29 French & Parrello Associates $1,500,000
30 SSOE Group $1,473,611
31 Glumac $1,404,000
32 Peter Basso Associates $1,400,000
33 Wallace Engineering $1,350,000
34 Henderson Engineers $1,118,069
35 Brinjac Engineering $1,080,748
36 Clark Nexsen $1,063,791
37 G&W Engineering $1,000,000
37 KLH Engineers $1,000,000
37 WSP USA $1,000,000
40 TLC Engineering for Architecture $933,884
41 H.F. Lenz $847,000
42 Davis, Bowen & Friedel $833,642
43 Sparling $785,356
44 Primera Engineers $748,000
45 M-E Engineers $700,000
46 Environmental Systems Design $610,185
47 Paulus, Sokolowski and Sartor $500,000
48 RMF Engineering Design $500,000
49 OLA Consulting Engineers $400,000
50 Rolf Jensen & Associates $400,000
51 Karpinski Engineering $379,369
52 Bala Consulting Engineers $350,000
53 Eaton Energy Solutions $312,320
54 Wick Fisher White $300,697
55 Apogee Consulting Group $278,000
56 Arup $251,475
57 Aon Fire Protection Engineering $200,000
57 GHT Limited $200,000
59 Mazzetti $182,262
60 Dunham Associates $150,000
61 GRW $135,860
62 Magnusson Klemencic Associates $109,780
63 Science Applications International Corp. $109,282
64 Barge, Waggoner, Sumner and Cannon $100,000
64 CTLGroup $100,000
66 Degenkolb Engineers $97,850
67 P2S Engineering $86,100
68 Spectrum Engineers $83,820
69 Affiliated Engineers $55,000
70 Kamm Consulting $45,861
71 Newcomb & Boyd $42,814
72 Haynes Whaley Associates $34,139
73 Walter P Moore $29,068

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Apr 17, 2012

Princeton Review releases “Guide to 322 Green Colleges”

The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their academic offerings, campus infrastructure, activities and career preparation.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 17, 2012

Freese and Nichols awarded Malcolm Baldridge National Quality Award

Freese and Nichols is the only engineering and architecture firm to ever receive this recognition.

| Apr 17, 2012

Miramar College police substation in San Diego receives LEED Platinum

The police substation is the first higher education facility in San Diego County to achieve LEED Platinum Certification, the highest rating possible.

| Apr 17, 2012

Alberici receives 2012 ASA General Contractor of the Year award

Alberici has been honored by the ASA eight times in the award’s nineteen-year history--more than any other general contractor in its class.

| Apr 16, 2012

Freeland promoted to vice president at Heery International

Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 16, 2012

UNT lab designed to study green energy technologies completed

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.

| Apr 16, 2012

Shawmut awarded Tag Heuer builds in Florida and Pennsylvania

Both projects are scheduled to be completed this spring.

| Apr 16, 2012

Batson-Cook breaks ground on senior living center in Brunswick, Ga.

Marks the third Benton House project constructed by Batson-Cook.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021