Rank Company 2012 K-12 Revenue ($)
1 AECOM Technology Corp. $100,150,000
2 URS Corp. $55,927,778
3 STV $45,937,000
4 Jacobs Engineering Group $36,550,000
5 Parsons Brinckerhoff $19,100,000
6 TTG $9,985,300
7 Shive-Hattery $7,379,425
8 BRPH $4,900,000
9 KCI Technologies $4,200,000
10 Dewberry $3,852,971
11 KJWW Engineering Consultants $3,643,844
12 Thornton Tomasetti $3,589,317
13 Wiss, Janney, Elstner Associates $3,570,000
14 Joseph R. Loring & Associates $3,500,000
15 KPFF Consulting Engineers $3,000,000
16 M/E Engineering $2,779,150
17 Interface Engineering $2,745,564
18 Simpson Gumpertz & Heger $2,700,000
19 CJL Engineering $2,507,621
20 Rist-Frost-Shumway Engineering $2,500,000
21 FBA Engineering $2,405,000
22 Allen & Shariff $2,200,000
23 Coffman Engineers $2,140,000
24 Heapy Engineering $2,086,975
25 Bridgers & Paxton Consulting Engineers $2,024,266
26 RDK Engineers $1,975,000
27 AKF Group $1,576,000
28 Vanderweil Engineers $1,553,500
29 French & Parrello Associates $1,500,000
30 SSOE Group $1,473,611
31 Glumac $1,404,000
32 Peter Basso Associates $1,400,000
33 Wallace Engineering $1,350,000
34 Henderson Engineers $1,118,069
35 Brinjac Engineering $1,080,748
36 Clark Nexsen $1,063,791
37 G&W Engineering $1,000,000
37 KLH Engineers $1,000,000
37 WSP USA $1,000,000
40 TLC Engineering for Architecture $933,884
41 H.F. Lenz $847,000
42 Davis, Bowen & Friedel $833,642
43 Sparling $785,356
44 Primera Engineers $748,000
45 M-E Engineers $700,000
46 Environmental Systems Design $610,185
47 Paulus, Sokolowski and Sartor $500,000
48 RMF Engineering Design $500,000
49 OLA Consulting Engineers $400,000
50 Rolf Jensen & Associates $400,000
51 Karpinski Engineering $379,369
52 Bala Consulting Engineers $350,000
53 Eaton Energy Solutions $312,320
54 Wick Fisher White $300,697
55 Apogee Consulting Group $278,000
56 Arup $251,475
57 Aon Fire Protection Engineering $200,000
57 GHT Limited $200,000
59 Mazzetti $182,262
60 Dunham Associates $150,000
61 GRW $135,860
62 Magnusson Klemencic Associates $109,780
63 Science Applications International Corp. $109,282
64 Barge, Waggoner, Sumner and Cannon $100,000
64 CTLGroup $100,000
66 Degenkolb Engineers $97,850
67 P2S Engineering $86,100
68 Spectrum Engineers $83,820
69 Affiliated Engineers $55,000
70 Kamm Consulting $45,861
71 Newcomb & Boyd $42,814
72 Haynes Whaley Associates $34,139
73 Walter P Moore $29,068

 

Back to the K-12 School Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021