flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Multifamily Engineering Firms [2013 Giants 300 Report]

Top Multifamily Engineering Firms [2013 Giants 300 Report]

STV, URS, AECOM top Building Design+Construction's 2013 ranking of the largest multifamily engineering and engineering/architecture firms in the United States.


By BD+C Staff | July 17, 2013
Rank Company 2012 Multifamily Revenue ($)
1 STV $42,284,000
2 URS Corp. $42,072,070
3 AECOM Technology Corp. $39,580,000
4 Parsons Brinckerhoff $37,500,000
5 Michael Baker Jr. $21,020,000
6 Buro Happold Consulting Engineers $20,430,000
7 Wiss, Janney, Elstner Associates $18,070,000
8 Thornton Tomasetti $13,899,030
9 KPFF Consulting Engineers $13,000,000
10 Simpson Gumpertz & Heger $10,200,000
11 WSP USA $9,500,191
12 Arup $7,452,506
13 Magnusson Klemencic Associates $6,754,614
14 Dewberry $5,927,378
15 KCI Technologies $4,000,000
16 Science Applications International Corp. $3,142,018
17 Walker Parking Consultants $3,109,222
18 Aon Fire Protection Engineering $3,010,000
19 Paulus, Sokolowski and Sartor $2,800,000
20 AKF Group $2,008,000
21 Rolf Jensen & Associates $2,000,000
22 Glumac $1,958,000
23 Bala Consulting Engineers $1,950,000
24 Haynes Whaley Associates $1,755,846
25 CTLGroup $1,700,000
26 M-E Engineers $1,500,000
27 Allen & Shariff $1,450,000
28 Interface Engineering $1,397,312
29 TLC Engineering for Architecture $1,347,023
30 Clark Nexsen $1,243,665
31 M/E Engineering $1,134,350
32 Davis, Bowen & Friedel $1,131,802
33 Coffman Engineers $1,075,000
34 Barge, Waggoner, Sumner and Cannon $1,000,000
34 French & Parrello Associates $1,000,000
36 H&A Architects & Engineers $804,768
37 GRAEF $801,255
38 Smith Seckman Reid $784,137
39 RDK Engineers $739,000
40 Vanderweil Engineers $737,700
41 Apogee Consulting Group $718,000
42 KJWW Engineering Consultants $673,446
43 Walter P Moore $606,875
44 Guernsey $573,651
45 Sparling $500,395
46 TTG $450,250
47 GHT Limited $400,000
48 Henderson Engineers $368,297
49 OLA Consulting Engineers $350,000
50 RMF Engineering Design $300,000
51 G&W Engineering $225,000
52 Newcomb & Boyd $212,680
53 Mazzetti $193,774
54 Kamm Consulting $157,300
55 Wallace Engineering $150,000
56 Karpinski Engineering $148,594
57 Joseph R. Loring & Associates $140,000
58 Environmental Systems Design $128,159
59 Stanley Consultants $121,742
60 FBA Engineering $100,000
61 Eaton Energy Solutions $77,000
62 Jacobs Engineering Group $59,000
63 Heapy Engineering $54,477
64 Dunham Associates $50,000
65 Wick Fisher White $48,762
66 Degenkolb Engineers $24,624
67 Total Building Commissioning $16,360

 

Read the Multifamily Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021