flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Office Sector Engineering Firms [2013 Giants 300 Report]

Top Office Sector Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Jacobs top Building Design+Construction's 2013 ranking of the largest office sector engineering and engineering/architecture firms in the U.S.


By BD+C Staff | July 22, 2013
Rank Company 2012 Office Revenue ($)
1 AECOM Technology Corp. $830,320,000
2 Parsons Brinckerhoff $146,400,000
3 Jacobs Engineering Group $95,180,000
4 Burns & McDonnell $82,020,000
5 Thornton Tomasetti $50,861,467
6 Michael Baker Jr. $50,720,000
7 WSP USA $48,500,162
8 Arup $32,355,607
9 Buro Happold Consulting Engineers $28,720,000
10 AKF Group $26,917,000
11 Allen & Shariff $23,000,000
12 Syska Hennessy Group $22,537,724
13 URS Corp. $22,004,616
14 Environmental Systems Design $19,528,391
15 Science Applications International Corp. $18,346,871
16 Dewberry $16,371,636
17 Wiss, Janney, Elstner Associates $13,850,000
18 GHT Limited $12,944,469
19 Glumac $12,535,000
20 Haynes Whaley Associates $10,928,961
21 Magnusson Klemencic Associates $10,597,664
22 Vanderweil Engineers $10,485,700
23 KPFF Consulting Engineers $10,000,000
24 BRPH $9,800,000
25 RDK Engineers $9,578,000
26 Simpson Gumpertz & Heger $8,500,000
27 Clark Nexsen $6,169,304
28 Rolf Jensen & Associates $6,000,000
29 H.F. Lenz $5,357,000
30 H&A Architects & Engineers $5,239,486
31 Joseph R. Loring & Associates $5,150,000
32 Bridgers & Paxton Consulting Engineers $4,807,632
33 ThermalTech Engineering $3,800,000
34 CJL Engineering $3,521,065
35 Smith Seckman Reid $3,508,905
36 STV $3,505,000
37 SSOE Group $3,380,239
38 Newcomb & Boyd $3,371,710
39 Heapy Engineering $3,362,333
40 Sparling $3,275,463
41 TTG $3,203,930
42 Bala Consulting Engineers $3,160,000
43 Walker Parking Consultants $3,109,222
44 M-E Engineers $3,100,000
45 Henderson Engineers $3,014,367
46 Hixson Architecture, Engineering, Interiors $3,000,000
47 TLC Engineering for Architecture $2,991,691
48 Interface Engineering $2,962,807
49 Coffman Engineers $2,825,000
50 Walter P Moore $2,681,402
51 KLH Engineers $2,600,000
52 KJWW Engineering Consultants $2,352,444
53 Karpinski Engineering $2,179,216
54 Aon Fire Protection Engineering $2,000,000
55 Primera Engineers $1,998,000
56 Affiliated Engineers $1,968,000
57 Dunham Associates $1,750,000
58 Spectrum Engineers $1,745,854
59 Peter Basso Associates $1,700,000
60 GRAEF $1,572,073
61 CTLGroup $1,500,000
61 Middough $1,500,000
61 Paulus, Sokolowski and Sartor $1,500,000
64 Degenkolb Engineers $1,497,172
65 Shive-Hattery $1,480,615
66 Wick Fisher White $1,462,851
67 French & Parrello Associates $1,400,000
68 Brinjac Engineering $1,199,912
69 Zak Companies $1,151,229
70 M/E Engineering $1,134,350
71 KCI Technologies $1,000,000
71 OLA Consulting Engineers $1,000,000
73 Kamm Consulting $947,456
74 Mazzetti $945,119
75 Bergmann Associates $921,000
76 Bard, Rao + Athanas Consulting Engineers $900,000
77 Wallace Engineering $825,000
78 CCRD Partners $700,000
79 Eaton Energy Solutions $613,024
80 GRW $542,150
81 G&W Engineering $450,000
82 P2S Engineering $383,806
83 Davis, Bowen & Friedel $284,349
84 Guernsey $241,535
85 Ross & Baruzzini $225,000
86 RMF Engineering Design $75,000
87 Apogee Consulting Group $59,000
88 Total Building Commissioning $43,810
89 Stanley Consultants $10,107
90 FBA Engineering $10,000

 

Read the Office Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Dec 6, 2010

Honeywell survey

Rising energy costs and a tough economic climate have forced the nation’s school districts to defer facility maintenance and delay construction projects, but they have also encouraged districts to pursue green initiatives, according to Honeywell’s second annual “School Energy and Environment Survey.”

| Dec 2, 2010

GKV Architects wins best guest room design award for Park Hyatt Istanbul

Gerner Kronick + Valcarcel, Architects, PC won the prestigious Gold Key Award for Excellence in Hospitality Design for best guest room, Park Hyatt Macka Palas, Istanbul, Turkey. Park Hyatt Maçka Palace marries historic and exotic elements with modern and luxurious, creating a unique space perpetuating Istanbul’s current culture. In addition to the façade restoration, GKV Architects designed 85  guestrooms, five penthouse suites, an ultra-hip rooftop bar, and a first-of-its-kind for Istanbul – a steakhouse, for the luxury  hotel.

| Dec 2, 2010

U.S Energy Secretary Chu announces $21 Million to improve energy use in commercial buildings

U.S. Energy Secretary Steven Chu announced that 24 projects are receiving a total of $21 million in technical assistance to dramatically reduce the energy used in their commercial buildings. This initiative will connect commercial building owners and operators with multidisciplinary teams including researchers at DOE's National Laboratories and private sector building experts. The teams will design, construct, measure, and test low-energy building plans, and will help accelerate the deployment of cost-effective energy-saving measures in commercial buildings across the United States.

| Nov 29, 2010

Data Centers: Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation’s largest commercial user of electric power. Major technology companies, notably Hewlett-Packard, Cisco Systems, and International Business Machines, are investing heavily in new data centers. HP, which acquired technology services provider EDS in 2008, announced in June that it would be closing many of its older data centers and would be building new, more highly optimized centers around the world.

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 29, 2010

Renovating for Sustainability

Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021