Rank Company 2012 Office Revenue ($)
1 AECOM Technology Corp. $830,320,000
2 Parsons Brinckerhoff $146,400,000
3 Jacobs Engineering Group $95,180,000
4 Burns & McDonnell $82,020,000
5 Thornton Tomasetti $50,861,467
6 Michael Baker Jr. $50,720,000
7 WSP USA $48,500,162
8 Arup $32,355,607
9 Buro Happold Consulting Engineers $28,720,000
10 AKF Group $26,917,000
11 Allen & Shariff $23,000,000
12 Syska Hennessy Group $22,537,724
13 URS Corp. $22,004,616
14 Environmental Systems Design $19,528,391
15 Science Applications International Corp. $18,346,871
16 Dewberry $16,371,636
17 Wiss, Janney, Elstner Associates $13,850,000
18 GHT Limited $12,944,469
19 Glumac $12,535,000
20 Haynes Whaley Associates $10,928,961
21 Magnusson Klemencic Associates $10,597,664
22 Vanderweil Engineers $10,485,700
23 KPFF Consulting Engineers $10,000,000
24 BRPH $9,800,000
25 RDK Engineers $9,578,000
26 Simpson Gumpertz & Heger $8,500,000
27 Clark Nexsen $6,169,304
28 Rolf Jensen & Associates $6,000,000
29 H.F. Lenz $5,357,000
30 H&A Architects & Engineers $5,239,486
31 Joseph R. Loring & Associates $5,150,000
32 Bridgers & Paxton Consulting Engineers $4,807,632
33 ThermalTech Engineering $3,800,000
34 CJL Engineering $3,521,065
35 Smith Seckman Reid $3,508,905
36 STV $3,505,000
37 SSOE Group $3,380,239
38 Newcomb & Boyd $3,371,710
39 Heapy Engineering $3,362,333
40 Sparling $3,275,463
41 TTG $3,203,930
42 Bala Consulting Engineers $3,160,000
43 Walker Parking Consultants $3,109,222
44 M-E Engineers $3,100,000
45 Henderson Engineers $3,014,367
46 Hixson Architecture, Engineering, Interiors $3,000,000
47 TLC Engineering for Architecture $2,991,691
48 Interface Engineering $2,962,807
49 Coffman Engineers $2,825,000
50 Walter P Moore $2,681,402
51 KLH Engineers $2,600,000
52 KJWW Engineering Consultants $2,352,444
53 Karpinski Engineering $2,179,216
54 Aon Fire Protection Engineering $2,000,000
55 Primera Engineers $1,998,000
56 Affiliated Engineers $1,968,000
57 Dunham Associates $1,750,000
58 Spectrum Engineers $1,745,854
59 Peter Basso Associates $1,700,000
60 GRAEF $1,572,073
61 CTLGroup $1,500,000
61 Middough $1,500,000
61 Paulus, Sokolowski and Sartor $1,500,000
64 Degenkolb Engineers $1,497,172
65 Shive-Hattery $1,480,615
66 Wick Fisher White $1,462,851
67 French & Parrello Associates $1,400,000
68 Brinjac Engineering $1,199,912
69 Zak Companies $1,151,229
70 M/E Engineering $1,134,350
71 KCI Technologies $1,000,000
71 OLA Consulting Engineers $1,000,000
73 Kamm Consulting $947,456
74 Mazzetti $945,119
75 Bergmann Associates $921,000
76 Bard, Rao + Athanas Consulting Engineers $900,000
77 Wallace Engineering $825,000
78 CCRD Partners $700,000
79 Eaton Energy Solutions $613,024
80 GRW $542,150
81 G&W Engineering $450,000
82 P2S Engineering $383,806
83 Davis, Bowen & Friedel $284,349
84 Guernsey $241,535
85 Ross & Baruzzini $225,000
86 RMF Engineering Design $75,000
87 Apogee Consulting Group $59,000
88 Total Building Commissioning $43,810
89 Stanley Consultants $10,107
90 FBA Engineering $10,000

 

Read the Office Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

| Sep 16, 2010

Gehry’s Santa Monica Place gets a wave of changes

Omniplan, in association with Jerde Partnership, created an updated design for Santa Monica Place, a shopping mall designed by Frank Gehry in 1980.

| Sep 16, 2010

Green recreation/wellness center targets physical, environmental health

The 151,000-sf recreation and wellness center at California State University’s Sacramento campus, called the WELL (for “wellness, education, leisure, lifestyle”), has a fitness center, café, indoor track, gymnasium, racquetball courts, educational and counseling space, the largest rock climbing wall in the CSU system.

| Sep 13, 2010

Community college police, parking structure targets LEED Platinum

The San Diego Community College District's $1.555 billion construction program continues with groundbreaking for a 6,000-sf police substation and an 828-space, four-story parking structure at San Diego Miramar College.

| Sep 13, 2010

Campus housing fosters community connection

A 600,000-sf complex on the University of Washington's Seattle campus will include four residence halls for 1,650 students and a 100-seat cafe, 8,000-sf grocery store, and conference center with 200-seat auditorium for both student and community use.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021