Rank Company 2012 Office Revenue ($)
1 AECOM Technology Corp. $830,320,000
2 Parsons Brinckerhoff $146,400,000
3 Jacobs Engineering Group $95,180,000
4 Burns & McDonnell $82,020,000
5 Thornton Tomasetti $50,861,467
6 Michael Baker Jr. $50,720,000
7 WSP USA $48,500,162
8 Arup $32,355,607
9 Buro Happold Consulting Engineers $28,720,000
10 AKF Group $26,917,000
11 Allen & Shariff $23,000,000
12 Syska Hennessy Group $22,537,724
13 URS Corp. $22,004,616
14 Environmental Systems Design $19,528,391
15 Science Applications International Corp. $18,346,871
16 Dewberry $16,371,636
17 Wiss, Janney, Elstner Associates $13,850,000
18 GHT Limited $12,944,469
19 Glumac $12,535,000
20 Haynes Whaley Associates $10,928,961
21 Magnusson Klemencic Associates $10,597,664
22 Vanderweil Engineers $10,485,700
23 KPFF Consulting Engineers $10,000,000
24 BRPH $9,800,000
25 RDK Engineers $9,578,000
26 Simpson Gumpertz & Heger $8,500,000
27 Clark Nexsen $6,169,304
28 Rolf Jensen & Associates $6,000,000
29 H.F. Lenz $5,357,000
30 H&A Architects & Engineers $5,239,486
31 Joseph R. Loring & Associates $5,150,000
32 Bridgers & Paxton Consulting Engineers $4,807,632
33 ThermalTech Engineering $3,800,000
34 CJL Engineering $3,521,065
35 Smith Seckman Reid $3,508,905
36 STV $3,505,000
37 SSOE Group $3,380,239
38 Newcomb & Boyd $3,371,710
39 Heapy Engineering $3,362,333
40 Sparling $3,275,463
41 TTG $3,203,930
42 Bala Consulting Engineers $3,160,000
43 Walker Parking Consultants $3,109,222
44 M-E Engineers $3,100,000
45 Henderson Engineers $3,014,367
46 Hixson Architecture, Engineering, Interiors $3,000,000
47 TLC Engineering for Architecture $2,991,691
48 Interface Engineering $2,962,807
49 Coffman Engineers $2,825,000
50 Walter P Moore $2,681,402
51 KLH Engineers $2,600,000
52 KJWW Engineering Consultants $2,352,444
53 Karpinski Engineering $2,179,216
54 Aon Fire Protection Engineering $2,000,000
55 Primera Engineers $1,998,000
56 Affiliated Engineers $1,968,000
57 Dunham Associates $1,750,000
58 Spectrum Engineers $1,745,854
59 Peter Basso Associates $1,700,000
60 GRAEF $1,572,073
61 CTLGroup $1,500,000
61 Middough $1,500,000
61 Paulus, Sokolowski and Sartor $1,500,000
64 Degenkolb Engineers $1,497,172
65 Shive-Hattery $1,480,615
66 Wick Fisher White $1,462,851
67 French & Parrello Associates $1,400,000
68 Brinjac Engineering $1,199,912
69 Zak Companies $1,151,229
70 M/E Engineering $1,134,350
71 KCI Technologies $1,000,000
71 OLA Consulting Engineers $1,000,000
73 Kamm Consulting $947,456
74 Mazzetti $945,119
75 Bergmann Associates $921,000
76 Bard, Rao + Athanas Consulting Engineers $900,000
77 Wallace Engineering $825,000
78 CCRD Partners $700,000
79 Eaton Energy Solutions $613,024
80 GRW $542,150
81 G&W Engineering $450,000
82 P2S Engineering $383,806
83 Davis, Bowen & Friedel $284,349
84 Guernsey $241,535
85 Ross & Baruzzini $225,000
86 RMF Engineering Design $75,000
87 Apogee Consulting Group $59,000
88 Total Building Commissioning $43,810
89 Stanley Consultants $10,107
90 FBA Engineering $10,000

 

Read the Office Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Museums | Aug 11, 2010

Design guidelines for museums, archives, and art storage facilities

This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021