flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Top Science and Technology Sector Architecture Firms [2013 Giants 300 Report]

Top Science and Technology Sector Architecture Firms [2013 Giants 300 Report]

HDR, Perkins+Will, HOK top Building Design+Construction's 2013 ranking of the largest science and technology sector architecture and architecture/engineering firms in the U.S.


By BD+C Staff | August 8, 2013
Mane's new 85,000-sf facility sits on six of its 30-acre campus in Lebanon, Ohio
Mane's new 85,000-sf facility sits on six of its 30-acre campus in Lebanon, Ohio. Photo: courtesy Hixson Architecture Engineering Interiors

 

 

 

 

 

 

 

 

Rank Company 2012 S+T Revenue ($)
1 HDR Architecture $91,252,000
2 Perkins+Will $48,373,568
3 HOK $38,347,000
4 Stantec $33,111,469
5 SmithGroupJJR $26,400,000
6 Flad Architects $21,480,000
7 Payette $18,434,029
8 ZGF Architects $16,214,267
9 EwingCole $11,000,000
10 FKP Architects $10,250,000
11 Ennead Architects $6,780,000
12 NBBJ $4,942,000
13 PageSoutherlandPage $4,520,000
14 Perkins Eastman $4,350,000
15 Harley Ellis Devereaux $4,333,000
16 BSA LifeStructures $4,160,841
17 Gensler $3,000,000
18 Ware Malcomb $2,752,000
19 Solomon Cordwell Buenz $2,500,000
20 NELSON $2,213,915
21 Reynolds, Smith and Hills $2,180,000
22 HLW International $2,000,000
23 Lord, Aeck & Sargent $2,000,000
24 SHW Group $1,545,528
25 IBI Group $1,533,629
26 EYP $1,500,000
27 FGM Architects $1,489,000
28 Kirksey Architecture $1,480,677
29 Emersion Design $1,415,292
30 SMMA | Symmes Maini & McKee Associates $1,350,000
31 S/L/A/M Collaborative, The $1,224,000
32 HKS $1,000,000
33 Francis Cauffman $770,867
34 Westlake Reed Leskosky $500,000
35 VOA Associates $270,000
36 KZF Design $255,878
37 Omniplan Architects $238,983
38 Harvard Jolly Architecture $182,000
39 JRS Architect $150,000
40 DesignGroup $103,204
41 Environetics $100,000
42 BBS Architects, Landscape Architects and Engineers $55,000
43 Mithun $43,000
44 Skidmore, Owings & Merrill $42,000
45 Nadel $35,000
46 FXFOWLE Architects $18,880
47 RSP Architects $16,000
48 Cooper Carry $14,724
49 Carrier Johnson + Culture $11,500

 

Back to the Science and Technology Sector Giants article

 

Read BD+C's full Giants 300 Report

Related Stories

Codes and Standards | Jul 15, 2024

New York City code update changes definition of a major building

Changes affecting how construction projects in New York City are permitted will have significant impacts for contractors. On Dec. 11, the definition of a major building in the city’s code will change from 10 stories to seven, or 75 feet. The change will affect thousands more projects.

Adaptive Reuse | Jul 12, 2024

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

University Buildings | Jul 11, 2024

3 considerations for designing healthy, adaptable student dining

Amanda Vigneau, IIDA, NCDIQ, LEED ID+C, Director, Shepley Bulfinch, shares three ways student dining facilities have evolved to match changes in student life.

Healthcare Facilities | Jul 11, 2024

New download: BD+C's 2024 Healthcare Annual Report

Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This free 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.

Transit Facilities | Jul 10, 2024

Historic Fresno train depot to be renovated for California high speed rail station project

A long-shuttered rail station in Fresno, Calif., will be renovated to serve as the city’s high speed rail (HSR) station as part of the California High-Speed Rail Authority system, the nation’s first high speed rail project. California’s HSR system will eventually link more than 800 miles of rail, served by up to 24 stations.

Government Buildings | Jul 8, 2024

GSA adopts new accessibility guidelines for federal properties

The U.S. General Services Administration (GSA) adopted a new rule with new accessibility guidelines for federal buildings. The rule establishes that pedestrian facilities in the public right-of-way are readily accessible to and usable by people with disabilities. 

Office Buildings | Jul 8, 2024

Office vacancy peak of 22% to 28% forecasted for 2026

The work from home trend will continue to put pressure on the office real estate market, with peak vacancy of between 22% and 28% in 2026, according to a forecast by Moody’s.

Virtual Reality | Jul 8, 2024

Can a VR-enabled AEC firm transform your project?

With the aid of virtual reality and three-dimensional visualization technologies, designers, consultants, and their clients can envision a place as though the project were in a later stage.

Green | Jul 8, 2024

Global green building alliance releases guide for $35 trillion investment to achieve net zero, meet global energy transition goals

The international alliance of UK-based Building Research Establishment (BRE), the Green Building Council of Australia (GBCA), the Singapore Green Building Council (SGBC), the U.S. Green Building Council (USGBC), and the Alliance HQE-GBC France developed the guide, Financing Transformation: A Guide to Green Building for Green Bonds and Green Loans, to strengthen global cooperation between the finance and real estate sectors.

Codes and Standards | Jul 8, 2024

New York State building code update would ban fossil fuels in new buildings

New York’s Building Code Council is set to include the All-Electric Buildings Act in its 2025 code update. The Act would ban natural gas and other fossil fuels in new buildings. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021