When Facebook announced this past March that it was buying Oculus VR for a reported $2 billion, it signaled the beginning of a new movement in the U.S. tech sectorâvirtual reality for the masses.
One of the most successful Kickstarter campaigns to dateâraising some $2.4 million from 9,522 investors in 2012âOculus VR aimed to shake up the highly specialized, cost-prohibitive virtual reality hardware market by offering a low-cost, plug-and-play VR headset geared for gamers.
At $350, the Oculus Rift was a fraction of the cost of competing hardware solutions at the time (several similarly priced systems have since been launched), and a tiny sliver of the cost of fully loaded CAVE (computer-assisted virtual reality) systems and VR simulators popular in the military and scientific communities, which can run in the $20,000-30,000 range.Â
With Mark Zuckerbergâs deep pockets behind the technology, it wonât be long before every gamer is fully immersed in VR environments. âOculus has the chance to create the most social platform ever, and change the way we work, play, and communicate,â said Facebookâs founder.
The technology is a natural fit for the AEC industry. Many firms are already building highly detailed BIM/VDC models of their most complex projects, so VR looks like the logical next step. Â
âMost peopleâincluding many in our industryâcannot read plans very well, so there are huge benefits in visualizing the design,â says Christopher Rippingham, BIM Manager and Construction Technology Specialist at DPR Construction. The firm is one of the industryâs early adopters of fully immersive VR modeling, operating a full-service VR showroom at its Redwood City, Calif., headquarters.Â
What you'll need to host truly immersive VR sessions
VR Headset or CAVE System
There are two approaches to creating a fully immersive VR experience: surround the users with a series of screens or projections, known as a CAVE (computer-assisted virtual environment), or have them wear headsets. Headsets are much less costlyâthe Oculus Rift starts at $350. Advanced 3D TVs and computer monitors can also be used, but the experience will be less immersive.ÂBeefed-up Workstation
VR sessions require tremendous processing power. Attempting to host a VR session on a MacBook Pro will likely result in a choppy, sluggish experience for the user. VR technology provider WorldViz recommends that VR workstations have an i5 or i7 processor with high clock speed, at least 8 gigabytes of RAM, and a dedicated graphics card.Advanced Controller
For power users, a keyboard will suffice for navigating a VR model. Not so for novices, especially clients. Our experts advise you to look into the many gaming controllers, data gloves, hybrid keyboards, joy sticks, and other VR controllers on the market. Theyâre relatively inexpensive and can greatly enhance the user experience and productivity during VR sessions. Â ÂDedicated Showroom Space
The beauty of modern VR headset technology is its portability. Sessions can be held virtually anywhereâat a clientâs office, a Building Team co-location site, even the job site. Our VR experts recommend creating a dedicated showroom area for VR sessions, with ample, professional-looking space, a powerful workstation, and all the tools and accessories needed to create a great experience for clients. ÂAccessories
VR technology firm PocketCake offers a mobile workstation, the VRSCA, that allows up to eight persons to navigate a VR model simultaneously for group coordination meetings or guided tours. WorldViz sells standard and custom avatars that can be placed in VR models to make the spaces more lifelike. The firm also offers a 3D sound system for more realistic acoustics.Â
There, DPR worked with VR technology provider WorldViz to install a corner CAVE (with multiple projections to create a 90-degree view) and a fully immersive, headset-based walkable VR environment. The firm has used advanced VR for several applications, including constructability reviews and virtual mockups.
âThe technology helps us drive a more predictable outcome for clients, whether thatâs the look and feel of a design or a specific detail that is going to be constructed,â says Rippingham. The ability to immerse clients in the space theyâre eventually going to occupy âhelps generate excitement and creates a volunteer army to help us with some of the issues we need to tackle,â he says.
Suffolk Construction doesnât have an in-house VR studio, but the firm has applied advanced VR on several projects to date, most recently on the Brigham and Womenâs Hospitalâs 620,000-sf, 13-story Brigham Building for the Future, currently under construction in Boston.
âAs an experiment, we modeled the entire project and had the doctors and support staff walk through the proposed spaces using a CAVE environment,â says Peter Campot, the firmâs Chief Innovation Officer and President of Healthcare, Science and Technology. âWe told them that they could change anything they wanted during a two-week review period, but after that they could only change colors. We got tremendous buy-in, and there have been minimal changes so far.â
By using VR, Suffolk has almost completely eliminated physical mockups on select healthcare and S+T projects, while greatly reducing change ordersâresulting in considerable savings.Â
âWeâre looking at a process of walking every client through a project virtually before we build it,â says Campot. âNine times out of ten, the reason they have changes is due to the client not understanding what they agreed to. If we can walk them through that, we eliminate that unknown.âÂ
Campot and Rippingham identified five solid applications for VR in the AEC field:
Virtual mockups. VR reduces the need for costly physical mockups and can be a more effective tool. Virtual mockups can be tweaked based on user input relatively quickly and retested in an iterative design process. âYou can refine the details much faster,â says Rippingham.
Constructability reviews. The technology offers a much richer environment for hashing out the details on the problematic components of a job. âWeâre getting away from the âfigure it out in the fieldâ mentality,â says Campot. âIt all starts with getting it right in the model.âÂ
Facilities operations training. Even before the building is completed, the Building Team can walk the facilities management staff through the inner workings of the design, conduct basic training on the systems and equipment, and gather feedback for improvement. Â
Â
An architect at AECOMâs Kansas City, Mo., office experiences a virtual reality simulation of a high-rise condo design concept. VR technology provider PocketCake created the VR model and powered the demonstration using its VRSCA mobile workstation and the Oculus Rift headset. PHOTO: COURTESY POCKETCAKE
Â
Safety hazard analysis. âWeâre putting our teams into the virtual reality environment so that they can more effectively analyze projects for fall hazards and other potential safety issues,â says Rippingham.
Real estate sales and marketing. VR can be a powerful tool for commercial real estate developers in preselling their space, especially on speculative office and condominium projects, where presales can greatly affect financing.
Â
5 VALUABLE TIPS FROM EARLY ADOPTERS
Hereâs some helpful advice from our experts on implementing VR in your firm:
1. Define the desired outcomes up front. Manage client expectations, says DPRâs Rippingham: âWhen a client says they want to look at their space in a virtual reality environment, we ask them what theyâre trying to achieve and we make sure theyâre aware of the level of effort required for each use.âÂ
2. Be prepared for extra workâand costsâto create the VR model. You canât just throw Oculus Rift on your BIM model and start navigating. The BIM model needs to be converted for VR use, which takes time and may require the expertise of a third-party specialist.
âThis is a limiting factor due to the fast pace in which designs evolve on most projects,â says Tim Meyers, Designer with 360 Architecture. âThe technology seems to be improving rapidly and may eventually be integrated with our current design tools so that we [will be] able to use it more efficiently on projects.â
3. Designate a tour guide for client sessions. Clients can easily get lost or disorientated when attempting to navigate a VR model solo. Look into VR setups that can accommodate multiple users simultaneously.Â
4. Beware of motion sickness, especially with the headset. Have people walk or move slowly through the model to avoid queasiness, advises Campot. The last thing you need is to get your client nauseous.
5. Consider adding avatars to the models. This is especially helpful for virtual mockup applications; for example, a surgeon avatar could simulate the steps required to conduct a procedure in an OR. âWe didnât do that initially and quickly realized it has a tremendous amount of value,â says Campot. âThe clientâs level of understanding of the space starts to kick in when they can test out the space for safety and efficiency by simulating procedures.âÂ
Related Stories
| Oct 4, 2011
GREENBUILD 2011: Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicagoâs Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.Â
| Oct 3, 2011
Balance bunker and Phase III projects breaks ground at Mitsubishi Plant in Georgia
The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI) in Japan, was designed by a joint design team of engineers and architects from The Austin Company of Cleveland, Ohio, MPSA and MHI.
| Oct 3, 2011
Cauceglia to lead Allsteelâs global accounts
Cauceglia is responsible for developing new global business strategies and expanding existing business within the Fortune 500 sector.
| Sep 30, 2011
BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery
The new structure serves as the cemetery's focal architectural point and center of operations. Â
| Sep 30, 2011
Kilbourn joins Perkins Eastman
Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.
| Sep 30, 2011
Design your own floor program
Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility.Â
| Sep 30, 2011
AAMA offers electronic technical documents with launch of virtual library
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMAâs technical information resources more readily available to their employees.
| Sep 29, 2011
Submit your Great Solutions
Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction.
| Sep 29, 2011
Busch Engineering, Science and Technology Residence Hall opens to Rutgers students
With a total development cost of $57 million, B.E.S.T. is the first on-campus residence hall constructed by Rutgers since 1994.