flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Transparency a key in Martin Luther King Jr. Memorial Library renovation

Libraries

Transparency a key in Martin Luther King Jr. Memorial Library renovation

Great Halls, an auditorium, a fabrication lab, and a roof garden will all be added to the Ludwig Mies van der Rohe building.


By David Malone, Associate Editor | February 22, 2017

Rendering courtesy of Mecanoo.

The Martin Luther King Jr. Memorial Library opened in Washington, D.C. in 1972. The 37,000-sm building was originally designed by Ludwig Mies van der Rohe and uses transparency and light as metaphors for freedom and knowledge.

Over four decades after the building originally opened, the library is set to undergo a substantial renovation to become a modern space that reflects a focus on people and the exchange of knowledge, ideas, and culture. Mecanoo and Martinez+Johnson Architecture will work together to update the building, taking care to keep much of library’s original architecture in tact.

The architects will turn the main entrance and the two adjacent cores into focal points by making them more transparent and through the addition of spacious stairwells. A “Great Hall” will be added as a centralized area designated for cultural performances and informal events.

Upper Great Halls will be created on the upper floors through the removal of brickwork cores, again, with the intention of increasing transparency and emphasizing horizontal orientation.

The library’s departments and functions have been grouped and distributed throughout the building in order to create well-organized floors for different users and purposes. Even when looking at the building from the outside, the different atmospheres on each floor will be readily visible.

The ground floor will be home to a café with a patio terrace sheltered by the building’s large continuous arcade. The fourth and fifth floors will contain a new two-story, 300-seat auditorium and event space. A new public rooftop garden will offer ample outdoor space and views of the surrounding capital city. The glazed perimeter of the building will be redesigned to accommodate people, and not just books.

Also included in the renovation are a fabrication lab, children’s library, special collections archive, and conference center. The project is expected to be completed by 2020.

 

 

Rendering courtesy of Mecanoo.

 

Rendering courtesy of Mecanoo.

 

Rendering courtesy of Mecanoo.

 

Rendering courtesy of Mecanoo.

 

Rendering courtesy of Mecanoo.

 

Rendering courtesy of Mecanoo.

Tags

Related Stories

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 23, 2014

Architecture Billings Index up nearly a point in June

AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.

| Jul 21, 2014

Economists ponder uneven recovery, weigh benefits of big infrastructure [2014 Giants 300 Report]

According to expert forecasters, multifamily projects, the Panama Canal expansion, and the petroleum industry’s “shale gale” could be saving graces for commercial AEC firms seeking growth opportunities in an economy that’s provided its share of recent disappointments.

| Jul 18, 2014

Contractors warm up to new technologies, invent new management schemes [2014 Giants 300 Report]

“UAV.” “LATISTA.” “CMST.” If BD+C Giants 300 contractors have anything to say about it, these new terms may someday be as well known as “BIM” or “LEED.” Here’s a sampling of what Giant GCs and CMs are doing by way of technological and managerial innovation.

| Jul 18, 2014

Top Construction Management Firms [2014 Giants 300 Report]

Jacobs, Barton Malow, Hill International top Building Design+Construction's 2014 ranking of the largest construction management and project management firms in the United States. 

| Jul 18, 2014

Top Contractors [2014 Giants 300 Report]

Turner, Whiting-Turner, Skanska top Building Design+Construction's 2014 ranking of the largest contractors in the United States. 

| Jul 18, 2014

Engineering firms look to bolster growth through new services, technology [2014 Giants 300 Report]

Following solid revenue growth in 2013, the majority of U.S.-based engineering and engineering/architecture firms expect more of the same this year, according to BD+C’s 2014 Giants 300 report. 

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021