flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Trump Hotel Collections announces luxury hotel for Rio de Janeiro

Trump Hotel Collections announces luxury hotel for Rio de Janeiro

Trump Hotel Collection and LSH Barra S.A. have partnered with the world’s premier design firms to create Trump Rio


By Trump Hotel Collection | January 31, 2014

Trump Hotel Collection announces the development of Trump Hotel Rio de Janeiro to be located in the posh Jardim Oceanico sub-district of the famous Barra da Tijuca borough and facing one of Rio’s most magnificent beaches.

The 13-story, 171-guestroom Trump Rio will be Trump Hotel Collection’s first property in South America and the only luxury hotel in the neighborhood when it opens in 2016.

“With the Barra da Tijuca hosting most of the venues of the 2016 Summer Olympics as well as Jardim Oceanico’s perfect mix of modernity and nature, the area is poised to emerge as the heart of Rio de Janeiro,” said Donald Trump Jr., executive vice president of development and acquisitions of The Trump Organization. “This is an exciting time to develop our first project in South America and the perfect location to do so.” 

Rio de Janeiro-based owner LSH Barra S.A. brings vital local expertise to the project, along with development consultant Polaris Brazil that has worked on a variety of innovative hospitality ventures including the Rio Convention Center. “We are thrilled to work with Trump Hotel Collection on the first South American addition to its prestigious collection of world-class hotels,” said Paulo Figueiredo Filho, CEO of LSH Barra S.A.

Trump Hotel Collection and LSH Barra S.A. have partnered with the world’s premier design firms to create Trump Rio, including a cutting-edge architectural concept by WATG, interiors by Rockwell Group, and landscape architecture by Witkin-Hults Design Group

For its interior design, Rockwell Group will infuse a vibrant and contemporary esthetic into the hotel’s public spaces and guestrooms, such as an amorphous sculptural front desk inspired by Rio’s mountainous landscape, beautifully crafted travertine walls with brass inlays in the lobby and event spaces, and guestroom furnishings that are modern yet organic. “Our design concept for Trump Rio combines Modernism with the energy and creativity of this burgeoning city,” said David Rockwell, founder and President of Rockwell Group. 

Expansive guestrooms will boast breathtaking ocean or mountain views, each featuring grey marble floors that seamlessly adjoin private outdoor balconies and terraces. Eleven spacious suites, ranging from 1,200 to 1,800 square feet, will feature private plunge pools on expansive private patios, from which ocean views can be soaked in. The capacious Presidential Suite will offer 2,992 square feet of luxury living like no other in Rio. 

 

Trump Rio will offer nearly 10,000 square feet of meeting and event space. Luxury amenities will include a 4,000 square-foot pool deck – with private VIP cabanas overlooking an infinity pool with panoramic beachfront views – a 4,000 square-foot nightclub, 2,200 square-foot spa, and a 2,000-square-foot fitness center. As with all Trump Hotel Collection properties, guests will have access to an exclusive range of services and signature programs, including Trump Attaché, an unparalleled brand of personalized service, Trump Hotel Collection, a privileges program with unrivaled member benefits and comprehensive fitness and nutrition amenities within Trump Wellness.

Trump Hotel Collection has formulated an aggressive international development strategy to acquire 30 properties within the collection by 2020,” said Jim Petrus, chief operating officer, Trump Hotel Collection. “Trump Rio embodies this vision perfectly, as the first luxury hotel to emerge in a burgeoning area of a growing market such as South America.” 

Trump Hotel Collection opened its first Latin American property, Trump Ocean Club International Hotel & Tower Panama, in 2011, and developments are currently underway in Vancouver and Washington, D.C.

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021