flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Two stations for San Francisco Airport’s people mover system showcase sustainable building practices

Transportation & Parking Facilities

Two stations for San Francisco Airport’s people mover system showcase sustainable building practices

The construction project, completed in the Spring, was awarded LEED Gold last month.


By John Caulfield, Senior Editor | October 6, 2021
San Francisco airport's AirTrain people mover now connects to a long-term parking garage. Images courtesy of Skanska
San Francisco airport's AirTrain system now connects to one of its long-term parking garages. Images courtesy of Skanska

In May, the San Francisco International Airport completed the extension of its AirTrain people mover system to its Long-Term Parking area. At that point, the AirTrain provided connectivity between all terminals, parking garages, an on-airport hotel, the city’s subway system, and the airport’s car rental center. Previously transportation between the long-term parking lot and the terminals had been provided by shuttle buses, and AirTrain’s extension is projected to eliminate 600,000 miles of trips annually, according to the airport.

This $259 million project, which launched in August 2016, extends the AirTrain guideways by 1,900 ft to reach the long-term parking lot. The project included the construction of two new AirTrain stations, each of which built under a $172 million progressive design-build contract with Skanska USA and WSP. The first station, located at the on-site Grand Hyatt hotel, opened to the public on October 2, 2019; the second station, with a pedestrian bridge that connects AirTrain to one of two Long-Term Parking multilevel garages, opened on May 5 of this year.

VERY GREEN STOPS

The construction project’s highlights include the installation of a 2,700-panel PV array on the roof of the long-term parking garage that will generate about two-fifths of the stations’ annual power needs. Water-efficient fittings and fixtures will cut the stations’ water use by 40%. Three-quarters of this project’s construction and demolition debris were recycled. The stations’ indoor air quality complies with LEED air quality assessment standards (prior to occupancy).

In total, more the 50 sustainable practices were implemented as part of the construction of the stations, which were certified LEED Gold in September. “Achieving LEED Gold certifications demonstrates our commitment to employing sustainable practices on every project we undertake,” said Tony Taddeo, Senior Vice President of Operations for Skanska USA Civil.

The interior of one of two new AirTrain stations at San Francisco airport.
AirTrain now extends to one of the airport's parking garages and the Grand Hyatt hotel.
 

PGH Wong was its construction manager on the AirTrain extension project.

AirTrain, which has been in operation since 2003, currently consists of 41 electric vehicles that run along six miles of fully automated concrete guideways.

Related Stories

Transportation & Parking Facilities | Jun 3, 2016

Colorful parking garage will serve commuters in Bay Area city

Artwork and patterns will be displayed on the structure’s 600-foot wide façade.  

Transportation & Parking Facilities | May 27, 2016

Automated West Hollywood parking garage makes the world a bit cleaner

Using robots to store and fetch parked cars will save on carbon dioxide emissions.  

Building Team Awards | May 24, 2016

Los Angeles bus depot squeezes the most from a tight site

The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.

Transportation & Parking Facilities | Mar 4, 2016

Calatrava's World Trade Center Transportation Hub is now open

Designed to look like a dove being released from a child's hands, the Oculus structure, the hub's focal point, is a symbol of rebirth for Lower Manhattan.

Giants 400 | Jan 29, 2016

TRANSIT SECTOR GIANTS: Perkins+Will, Skanska among top transit/TOD facility AEC firms

BD+C's rankings of the nation's largest transit/TOD sector design and construction firms, as reported in the 2015 Giants 300 Report 

Transit Facilities | Jan 18, 2016

Pennsylvania Station set to transform into a world-class transportation hub

Governor Andrew Cuomo presented plans to turn Pennsylvania Station and the neighboring James A. Farley Post Office into a free flowing 21st century work of art.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Airports | Aug 31, 2015

Airports expand rental car facilities to ease vehicular traffic at their terminals

AEC teams have found fertile ground in building or expanding consolidated rental car facilities, which are the No. 1 profit centers for most airports.

Sponsored | Transportation & Parking Facilities | Aug 3, 2015

Parking with a purpose: clean cars and solar power shape new structure

The project was the first of its kind in Canada to successfully demonstrate the integration of solar power, energy storage, and electric vehicle charging stations in a grid-tied or ‘islanded’ configuration.

Green | Jul 27, 2015

MUST SEE: Dutch company to test using plastic waste for road construction

KWS Infra is piloting a program to make roads from plastic garbage, including bags and bottles extracted from the ocean.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021