flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UC-Berkeley begins construction of art museum, film archive

UC-Berkeley begins construction of art museum, film archive

Adaptive reuse project will transform printing plant into $100 million cultural facility


By BD+C Staff | February 15, 2013
Adaptive reuse and addition will create art museum and film archive
Adaptive reuse and addition will create art museum and film archive

The University of California-Berkeley has begun work on a $100 million project to turn a 1939 printing plant into the new Berkeley Art Museum and Pacific Film Archive. The 50,000-sf concrete structure will be expanded with a new 30,000-sf steel-clad wing to the north. 

Museum galleries will be placed in the existing building, and the new wing will hold 230-seat and 32-seat film theaters, as well as a café. The current museum building has been determined to be seismically unsafe. The Building Team for the donor-funded project includes architects Diller Scofidio + Renfro and EHDD.

(http://www.sfgate.com/bayarea/place/article/Work-begins-on-Berkeley-museum-film-archive-4272577.php)

Related Stories

| Nov 11, 2013

Reconstruction of historic Salzburg, Austria railroad station took complex planning

Salzburg, Austria’s Central Station remained in operation during reconstruction, a feat that required complex planning.

| Nov 5, 2013

New IECC provision tightens historic building exemption

The International Energy Conservation Code has been revised to eliminate what has been seen as a blanket exemption for historic buildings.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 25, 2013

Hoffmann Architects announces launch of U.S. Capitol Dome restoration

The Architect of the Capitol will undertake comprehensive restoration of the 150-year-old cast iron Dome, which has not undergone a complete restoration since 1959-1960.

| Oct 23, 2013

Manhattan's landmark Marble Collegiate Church modernized

Helpern Architects, Structure Tone led the Building Team in a multi-phase project. 

| Oct 22, 2013

Slow-growth economy continues to boost renovations over new construction

Major renovation projects—those costing more than $100,000—climbed as a share of total nonresidential construction as the recession began and haven’t yet come down, breaking from historic patterns.

| Oct 15, 2013

Historic LA YMCA-turned apartment building wins World Architecture Festival award

A major renovation of an historic YMCA in Los Angeles to an apartment facility was named the 2013 World Architecture Festival Housing Award recipient.

| Oct 7, 2013

Nation's first glass curtain wall exterior restored in San Francisco

The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities. 

| Oct 7, 2013

Lenders want better data to fund more green building retrofits

The CEO of Pittsburgh’s Green Building Alliance says lenders want better data to justify loans for green building retrofits.

| Oct 1, 2013

Renovation of historic Winchester, Va., buildings uncovers Civil War cannonball, bullets

The renovation of a set of historic downtown Winchester, Va., buildings led to the discovery of several historic artifacts including a Civil War cannonball and bullets, a variety of old baseball cards, and a 1940s-era newspaper embedded in the drywall.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021