flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ULI report documents business case for building healthy projects

ULI report documents business case for building healthy projects

Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.


By Urban Land Institute | April 11, 2014
ECO Modern Flats is a wellness-oriented apartment complex in Fayetteville, Ark.,
ECO Modern Flats is a wellness-oriented apartment complex in Fayetteville, Ark., created from reconstruction of a property built

The economic benefits of building healthy places are outlined in a new publication from the Urban Land Institute (ULI)Building for Wellness: The Business Case. Released this week at the ULI Spring Meeting in Vancouver, the report examines the investment payback on incorporating amenities that promote health and wellness, how developers have pursued this objective, and the resulting market response.

The report was prepared as part of ULI’s Building Healthy Places initiative, a two-year global program of work that seeks to raise awareness of the connections between health and the built environment, and to encourage the development of communities that are conducive to healthy living.   

Building for Wellness profiles 13 completed projects from around the world, including ten in the U.S., two in Asia Pacific and one in Europe, each representing one of three development strategies – renovation / redevelopment, new construction and master-planned communities. 

The report finds several common experiences across the developments examined:

  • Developers received a better-than-anticipated market response, and their expectations were exceeded in terms of leasing times, sales rates, rental and sales premiums and waiting lists.
  • The development costs attributable to the inclusion of wellness components were generally reported to be a minimal percentage of the overall development budget. Exceptions to this were limited to cases of highly amenitized master-planned communities, where the additional costs were partially offset by homebuilder and resale fees.
  • The operating expenses for the maintenance of wellness components were typically minimal, with these costs in master-planned communities being covered by homeowner fees. Expenses such as staff to market the wellness amenities at a business park or a full-time groundskeeper were considered worth the additional investment.
  • Programming, such as fitness classes, walking groups and wellness seminars, were widely used to offer additional opportunities as well as encourage the use of wellness facilities. An added perk: such programming can often be provided through partnerships with nonprofit organizations and local businesses.

Three of the projects featured – Selandra Rise in Casey, Australia; Mueller in Austin, Texas; and Park 20 I 20 in Haarlemmermeer, Netherlands – are currently under study by universities and foundations regarding their impact on workers’ and residents’ health. Two universities have previously concluded that Mueller residents increased their physical activity by 40 to 50 minutes per week after moving into the development 

“To improve the well-being of our communities, we need to demonstrate that building for wellness makes good business sense,” said ULI Chief Executive Officer Patrick L. Phillips. “Building for Wellness: The Business Case outlines clear examples of how developers have built exemplary projects that help improve the health of their users, without incurring prohibitive additional costs and with the benefit of improving the commercial performance of their investment.”

Projects profiled include:

  • The Century Building in Pittsburgh, Penn.  – An example of redevelopment, the project opened in 2009 with 60 workforce and market-rate apartments, 12,000 square feet of office space and 10,000 square feet of retail. Located in the downtown area, the development was the first in the city to achieve LEED Gold certification and has a Walk Score® rating of 100, indicating the location is a “walker’s paradise”.

About 15 percent of the construction budget was allocated to sustainable and wellness features. Clean indoor air was ensured through a non-smoking policy, use of non-toxic building materials, a geothermal heating system and a recovery ventilation system which have led to residents with asthma and allergies claiming their condition has improved since moving to the building. Secure bicycle storage is included for use by residents and office tenants, as well as an onsite fitness center.

The business case: the project was fully leased within 90 days, six months ahead of its original schedule, and it maintains a remarkably high 90-percent retention rate. Ongoing maintenance costs for features such as the fitness center and bicycle storage are minimal.   

  • Park 20 I 20 in Haarlemmermeer in the Netherlands  -- A new development, the project is located on an 11 hectare (28 acre) site approximately 8 kilometers (5 miles) outside of Amsterdam. The first phase of a mixed-use business park, it was completed in April 2013, with additional phases to be completed by 2018. The project is only 100 meters (330 feet) from train and bus transit, and with a Walk Score® rating of 72, it is considered to be a “very walkable” location.

The development’s buildings ensure clean indoor air by maximizing air circulation, eliminating traditional ductwork, providing operable windows and incorporating green walls. The shapes of the buildings maximize natural light, and artificial light is provided through LEDs, which are the closest alternative to sunlight. Park 20 I 20 is a car-free site, with multiple walking and biking paths across the development; and it provides access to offsite fitness facilities. The development also included onsite greenhouses that are used to grow food used in the onsite restaurant.

The business case: a project that is currently 100-percent leased at rates of €200 per square meter, representing a premium of 12 percent over local Class A new office buildings. Phase II of the office buildings is also 100-percent pre-leased.

  • Selandra Rise in Casey, Australia – A master-planned community on 115 hectares (284 acres) in the city of Casey, which is 50 kilometers (30 miles) south of Melbourne. It incorporates 65 townhouses and 793 two, three, four and five detached houses. The first phase, completed in 2011, features a range of health and wellness features.

All homes are within 300 meters of parkland and trails, providing easy pedestrian and bicycle access to small pocket parks, and larger destination parks, as well as an outdoor fitness station. Reliance on cars is reduced by the inclusion of bike lanes and tree-lined sidewalks with a “way-finding” system designed to show how quickly people can walk or cycle to their destination. A community facility centrally located in the development arranges up to 30 programs per month to promote a healthy lifestyle and social interaction.

The business case: Selandra Rise is the fastest selling community project in Australia with prices averaging $7,000 to $12,000 (in Australian dollars) higher than competitor projects. The cost of wellness components was only one to two percent of the total project cost, and operating costs are similar to those of the developer’s other projects.  

In addition to the Century Building, Park 20 I 20 in Haarlemmermeer, and Selandra Rise, other developments profiled in the publication are: ECO Modern Flats in Fayetteville, Ark.; Innovation Park, Charlotte, N.C.; 1221 Broadway, San Antonio, Texas; Jackson Walk, Jackson, Tenn.; Via6, Seattle, Wash.; The Interlace, Singapore; Via Verde, New York, N.Y.; Grow Community, Bainbridge Island, Wash.; Rancho Sahuarita, Tucson, Ariz.; and Mueller, Austin, Texas.

Copies of Building for Wellness are now available for download.

Related Stories

| Nov 9, 2010

Designing a library? Don’t focus on books

How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.

| Nov 9, 2010

Turner Construction report: Green buildings still on the agenda

Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Nov 3, 2010

First of three green labs opens at Iowa State University

Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Nov 3, 2010

Seattle University’s expanded library trying for LEED Gold

Pfeiffer Partners Architects, in collaboration with Mithun Architects, programmed, planned, and designed the $55 million renovation and expansion of Lemieux Library and McGoldrick Learning Commons at Seattle University. The LEED-Gold-designed facility’s green features include daylighting, sustainable and recycled materials, and a rain garden.

| Nov 3, 2010

Recreation center targets student health, earns LEED Platinum

Not only is the student recreation center at the University of Arizona, Tucson, the hub of student life but its new 54,000-sf addition is also super-green, having recently attained LEED Platinum certification.

| Nov 3, 2010

New church in Connecticut will serve a growing congregation

Tocci Building Companies will start digging next June for the Black Rock Congregational Church in Fairfield, Conn. Designed by Wiles Architects, the 103,000-sf multiuse facility will feature a 900-person worship center with tiered stadium seating, a children’s worship center, a chapel, an auditorium, a gymnasium, educational space, administrative offices, commercial kitchen, and a welcome center with library and lounge.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021