flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

United Association, NRDC seek major plumbing code changes

United Association, NRDC seek major plumbing code changes

Proposed changes include mandating the insulation of hot water piping in new buildings. 


By BD+C Staff | January 8, 2014

The United Association of Journeymen and Apprentices of the Plumbing and Pipefitting Industry (UA) and the Natural Resources Defense Council (NRDC) have jointly submitted a proposal to the International Association of Plumbing and Mechanical Officials (IAPMO) to require the insulation of hot water piping in new buildings.

The measure is geared to stop the waste of millions of gallons of water by users who let water run until it gets hot enough for showering, hand washing, and washing dishes. NRDC and the UA propose that the 2015 edition of IAPMO’s Uniform Plumbing Code require insulation of all hot water piping systems.

(http://www.nrdc.org/media/2014/140106.asp)

Related Stories

| Aug 11, 2010

Gold Award: Eisenhower Theater, Washington, D.C.

The Eisenhower Theater in the John F. Kennedy Center for the Performing Arts in Washington, D.C., opened in 1971. By the turn of the century, after three-plus decades of heavy use, the 1,142-seat box-within-a-box playhouse on the Potomac was starting to show its age. Poor lighting and tired, worn finishes created a gloomy atmosphere.

| Aug 11, 2010

AIA course: MEP Technologies For Eco-Effective Buildings

Sustainable building trends are gaining steam, even in the current economic downturn. More than five billion square feet of commercial space has either been certified by the U.S. Green Building Council under its Leadership in Energy and Environmental Design program or is registered with LEED. It is projected that the green building market's dollar value could more than double by 2013, to as muc...

| Aug 11, 2010

Great Solutions: Technology

19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021