flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Univ. of Calif. Riverside’s plant research facility enables year-round plant growth

University Buildings

Univ. of Calif. Riverside’s plant research facility enables year-round plant growth

The state-of-the-art greenhouse is equipped with best-in-class research, climate control technologies.


By Peter Fabris, Contributing Editor | June 26, 2023
Univ. of Calif. Riverside’s plant research facility enables year-round plant growth All photographs are by Here and Now Agency
Photo: Here and Now Agency

The University of California, Riverside’s new plant research facility, a state-of-the-art greenhouse with best-in-class research and climate control technologies, recently held its grand opening. Construction of the two-story, 30,000 sf facility was completed in 2021. It then went through two years of preparation and testing.

The facility will enable students and faculty from UCR’s College of Natural and Agricultural Sciences (CNAS) to conduct innovative studies previously unachievable at the university. Teams are currently investigating how well bees can pollinate in different climates, testing how to grow rice to withstand drought and flooding conditions, and examining how plants can serve as soil decontaminants.

The gables of the surrounding greenhouses inspired the design of the building, which is expressed in the upper-level glass roofs. The serrated concrete walls at the ground level, and the array of fans running across the structure’s south elevation complement the rhythmic quality of the upper-level greenhouses. The minimalist use of concrete, steel, and glass allows the building to display its overall function and historical connectedness. The upper level supports a compact cluster of 16 greenhouse modules, each its own independent laboratory.

The serrated concrete wall that envelops the lower-level acts as a thermal mass that stabilizes swings in internal temperature, reducing the need for mechanical air conditioning and capitalizing on the Southern California climate. Each upper-level greenhouse is encased in double-pane polarized glass, revealing the research activities taking place within.

718032_N25_highres.jpg
Photo: Here and Now Agency

Humidity, temperature, lighting, and other conditions can be independently calibrated in each module to mimic a diverse range of conditions. Climate control is assisted through vertical and horizontal automated shades that enable researchers to closely tune the natural light. Air-conditioning stabilizes select areas, but an evaporative cooling system covers the whole building, allowing it to maintain temperatures lower than other research greenhouses on the campus.  

“We are anticipating placing priority on projects that need more specialized environment, things that need humidity and more accurate temperature control,” says Peggy Mauk, director of agricultural operations and a professor of subtropical horticulture with CNAS. According to Mauk, the facility will work well for research involving insects that need colder temperatures, plants that grow at high altitudes, or pathogens requiring tightly controlled environments. “The building is the first new plant research facility built on campus in close to 40 years,” says CNAS

Dean Kathryn Uhrich, “and is considered instrumental in maintaining UCR's continued leadership in agricultural research for the coming decades.”

On the project team: 

Owner and/or developer: University of California, Riverside 

Design architect: Perkins&Will Los Angeles

Architect of record: Perkins&Will Los Angeles

MEP engineer: tk1sc

Structural engineer: Coffman Engineers

General contractor/construction manager: DPR Construction

718032_N19_highres.jpg
Photo: Here and Now Agency
718032_N21_highres.jpg
Photo: Here and Now Agency
718032_N22_highres.jpg
Photo: Here and Now Agency
718032_N18_highres.jpg
Photo: Here and Now Agency
718032_N20_highres.jpg
Photo: Here and Now Agency
718032_N17_highres.jpg
Photo: Here and Now Agency
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles
Courtesy Perkins&Will Los Angeles

Related Stories

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

University Buildings | Aug 27, 2020

Eight strategies for achieving successful P3 development models

Transparency and communication are imperative, says new white paper on these agreements.

University Buildings | Aug 20, 2020

Student housing in the COVID-19 era

Student housing remains a vital part of the student and campus experience.

University Buildings | Aug 3, 2020

5 reasons universities are renovating student housing

Clark Nexsen’s Student Life practice leader, Peter Aranyi, discusses the benefits of renovation and why it offers particular value to campuses nationwide.

University Buildings | Aug 2, 2020

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

R&D hubs, modular-built hotels, and an award-winning student center on the August 6 “The Weekly”

University Buildings | Jul 24, 2020

A hybrid learning approach could redefine higher education

Universities reassess current assets to determine growth strategies.

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021