flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The University of Chicago Medicine is building its city’s first freestanding cancer center with inpatient and outpatient services

Healthcare Facilities

The University of Chicago Medicine is building its city’s first freestanding cancer center with inpatient and outpatient services

The $815 million project will consolidate care currently spread across five buildings and will have a capacity for up to 200,000 outpatient visits and 5,000 inpatient admissions per year.


By Novid Parsi, Contributing Editor | November 3, 2023
UChicago Medicine first freestanding cancer center TOWER FINAL Rendering courtesy CannonDesign
Rendering courtesy CannonDesign

The University of Chicago Medicine (UChicago Medicine) is building Chicago’s first freestanding cancer center with inpatient and outpatient services. Aiming to bridge longstanding health disparities on Chicago’s South Side, the $815 million project will consolidate care and about 200 team members currently spread across at least five buildings. 

The new facility, which broke ground in September, is expected to open to patients in spring 2027.

Designed by CannonDesign in collaboration with Blue Cottage of CannonDesign and Yazdani Studio, the center will serve both patient and academic needs by supporting the research, diagnosis, treatment, and prevention of cancer. It will have a capacity for up to 200,000 outpatient visits and 5,000 inpatient admissions per year.

The 575,000-sf, seven-story building, with room for expansion, will offer 80 inpatient beds (64 medical-surgical beds and a 16-bed ICU), 90 consultation and outpatient exam rooms, and an urgent care clinic that protects immunocompromised cancer patients from extended emergency room visits. To promote patient comfort and privacy, private infusion bays will be grouped by cancer type.

To improve the patient experience, the new facility will provide support services for patients and their families—including lifestyle classes, nutrition education, survivor support, music therapy, fitness classes, and a retail store selling cancer-specific products such as wigs or clothing with openings for ports. Family-friendly features also will include showers and on-site laundry machines, inpatient family dining areas, and larger consultation rooms for patients who attend appointments with loved ones.

In addition to a ground floor that serves both the University of Chicago campus and the surrounding neighborhood, amenities include a café, wellness and meeting spaces, public art, educational opportunities, and a publicly accessible garden.

The project will create more than 500 construction jobs and will give at least 41% of $435 million in construction contracts to minority- and women-owned firms.

On the Building Team:
Owner: University of Chicago Medicine (UChicago Medicine)
Design architect and architect of record: CannonDesign
MEP engineer: Affiliated Engineers with RTM Engineers
Structural engineer: Thornton Tomasetti
Contractor: Turner Construction

UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign
UChicago Medicine first freestanding cancer center Rendering courtesy CannonDesign
Rendering courtesy CannonDesign

 

 

Related Stories

Healthcare Facilities | Aug 3, 2021

New 9-story outpatient facility planned on Washington University Medical Campus

Lawrence Group and Perkins Eastman are designing the project.

Healthcare Facilities | Jul 27, 2021

Texas Oncology continues to expand its reach

It is replacing and consolidating a number of its cancer care centers.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

Daylighting Designs | Jul 9, 2021

New daylighting diffusers come in three shape options

Solatube introduces its newest technology innovation to its commercial product line, the OptiView Shaping Diffusers.

Healthcare Facilities | Jun 29, 2021

New Flagler Health+ Campus breaks ground in Durbin Park

Gresham Smith designed the project.

Healthcare Facilities | Jun 25, 2021

Hospital serving New Hampshire’s largest metro is expanding its ED

A pandemic delay led the design-build team to rethink the addition’s reception, waiting, and triage areas.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Healthcare Facilities | Jun 10, 2021

Abrazo Cave Creek Hospital completes in Cave Creek, Ariz.

E4H Architecture designed the project.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021