flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

University of Pittsburgh at Bradford’s new STEM building breaks ground

University Buildings

University of Pittsburgh at Bradford’s new STEM building breaks ground

HED designed the project.


By David Malone, Managing Editor | August 20, 2021
Pitt Bradford STEM building exterior
Pitt Bradford STEM building exterior

The University of Pittsburgh at Bradford has just broken ground on its first academic building in two decades.

The HED-designed Engineering & Information Technologies Building will be a 39,000-sf stand-alone facility that will house Mechanical Engineering Technology, Energy Engineering Technology, Relocated Energy Science & Technology, and Computer Information Systems & Technology programs. The facility will also include academic support space, engineering labs, engineering shops, computer labs, the campus data center, large group classrooms, and faculty and staff offices.

The building is positioned to be at the center of technology and innovation on campus and across the Pennsylvania-New York state-line region. It will be home to rapid prototyping machines, oscilloscopes, engineering lab stations, and other hands-on technical learning for students.

 

Pitt Bradford STEM building exterior

 

A cantilevered, metal-clad faculty office bar floats above a mostly glass-enclosed collaborative first floor. A deep building footprint and strategic integration of glass reduces energy usage while preserving access to daylight and views. Exposed ceilings in the building’s centralized maker hub intentionally put building systems on display.

In addition to HED, LGA Partners is the architect of record, interior designer, and construction administration. Rycon Construction is the general contractor. The Engineering & Information Technologies Building is slated for completion in late 2022.

Related Stories

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021