flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Updated Florida building codes helped newer homes withstand Hurricane Ian

Updated Florida building codes helped newer homes withstand Hurricane Ian

Wind losses in Lee County were twice as high on structures built before 1996.


By Peter Fabris, Contributing Editor | November 1, 2022
Hurricane Ian Construction
Courtesy Pexels.

Newer homes seemed to fare much better than older structures during Hurricane Ian, suggesting that updated Florida building codes made a difference.

In the hardest-hit parts of southwest Florida, many newer structures remained mostly intact in the up to 120 mph winds generated by the hurricane. One photograph on one beach area shows 18 homes built before 1981 that were completely destroyed, but one house, built in 2020, appears to be almost unscathed.

That home is elevated above much of the storm surge level, but the roof also appears undamaged. CoreLogic says that wind losses in Lee County, one of the coastal areas with the most damage, were twice as high for structures built before 1996, when the state began tightening building codes for wind load.

CoreLogic’s computer models peg insured losses from Hurricane Ian from $22 billion to $32 billion, excluding flood damage. It’s much lower than losses coastal Florida would have seen if newer structures had not been built to the stronger standards, according to CoreLogic and other experts.

Related Stories

Building Team | Oct 5, 2021

With billions in play, AEC groups make the case for 'buildings as infrastructure'

The Senate took a major step forward in August, passing the $1 trillion bipartisan Infrastructure Investment and Jobs Act.

AEC Business Innovation | Sep 28, 2021

Getting diversity, equity, and inclusion going in AEC firms

As a professional services organization built on attracting the best and brightest talent, VIATechnik relies on finding new ways to do just that. Here are some tips that we’ve learned through our diversity, equity, and inclusion (DE&I) journey.

Building Team | Sep 6, 2021

A biopharma fitout in Colorado showcases one AEC firm’s Integrated Project Delivery approach

CRB Group supplements its own services with as-needed outside expertise.

| Jul 13, 2021

Don't sell services when clients want outcomes: Evaluating + investing resources to navigate past the COVID-19 pandemic

As AEC firm leaders consider worst-case scenarios and explore possible solutions to surmount them, they learn to become nimble, quick, and ready to pivot as circumstances demand.

Building Team | Jun 29, 2021

AGC and Autodesk launch media library to boost representation of diversity in construction

Images readily available for editorial use showcase women and people of color in construction to increase visibility in industry media coverage.

Multifamily Housing | Jun 3, 2021

Student Housing Trends 2021-2022

In this exclusive video interview for HorizonTV, Fred Pierce, CEO of Pierce Education Properties, developer and manager of off-campus student residences, chats with Rob Cassidy, Editor, MULTIFAMILY Design + Construction about student housing during the pandemic and what to expect for on-campus and off-campus housing in Fall 2021 and into 2022.

Building Team | Apr 15, 2021

Owners, AEC firms primed for real collaboration

Survey findings point to a growing demand for collaboration and partnership during these chaotic times.

Building Team | Mar 3, 2021

To pivot or not to pivot: Resourceful solutions in a time of challenge

Like swerving to avoid oncoming traffic, over the last year, AEC companies have navigated the unexpected roadblocks presented by a challenging economy.

Building Team | Aug 21, 2020

A healthcare project in Wisconsin benefits from including MEP subs in early design discussions

Prefabrication played a major role in quickening construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021