flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

(UPDATED) Sasaki, Snøhetta, Studio T-Square, and HOK will lead the design of the Oakland A’s new stadium

Sports and Recreational Facilities

(UPDATED) Sasaki, Snøhetta, Studio T-Square, and HOK will lead the design of the Oakland A’s new stadium

The stadium is being planned for a piece of land that sits next to Lake Merritt near Downtown Oakland, surrounded by parkland and neighborhoods.


By David Malone, Associate Editor | November 16, 2017
The Oakland Coliseum

Photo: Amy K. Posner, Wikimedia Commons

For years the Oakland Athletics have been right at the top of the list of teams that desperately need a new ballpark. The Oakland Coliseum has caused the A’s a host of major league problems, chief among them recurring plumbing issues that have led to the clubhouses and dugouts flooding with sewage on numerous occasions.

Today, the team took another step closer to abandoning the problem child that is the Oakland Coliseum and announced it has hired four architecture firms to lead the design process of a new, problem-free home ballpark. Sasaki, Snøhetta, and Studio T-Square will lead the master planning and urban design efforts for the new stadium while HOK and Snøhetta will collaborate on the design.

Additionally, Sasaki, Snøhetta, and Studio T-Square will assist the A’s in a community engagement process. “A key component to making this project a success will be an active and meaningful engagement with A’s fans as well as with the broad and incredibly diverse community of Oakland,” says James Miner, AICP, Sasaki Principal, in a release. “We want the ballpark to be a great place not only for baseball, but also for the community and the environment.” There are no renderings yet, but Miner sees the new stadium as just one piece of the puzzle that will become an “urban ballpark district.”

Brad Schrock, AIA, regional leader of Sports + Recreation +Entertainment at HOK says, “We’re looking forward to collaborating with the A’s and our design partners to create an imaginative, amenity-rich, and enduring community asset.”

Currently, the stadium is being planned for a piece of land that sits next to Lake Merritt near Downtown Oakland. The area is surrounded by parkland and neighborhoods, a stark contrast to the sea of asphalt the Oakland Coliseum exists in. Estimates project the new stadium to seat 35,000 fans and cost approximately $500 million.

 

Update (12/06/17)

The A's just can't catch a break when it comes to getting a new ballpark. The board of trustees of Peralta Community College District, which owns the site near Laney College the new stadium was being designed for, voted to halt ongoing discussions with the A's.

"We are shocked by Peralta’s decision to not move forward," the A's said in a statement. "All we wanted to do was enter into a conversation about how to make this work for all of Oakland, Laney, & the Peralta Community College District. We are disappointed that we will not have that opportunity."

The next step for the team, if they are unable to rekindle discussions with the Peralta Community College District, is to reexamine other possibilities for a new stadium. The board's decision came as a surprise to the team, however, so a backup plan may not even exist.

Libby Schaaf, Oakland's mayor, remains optimistic about the A's future in the city and the team's ability to build a new ballpark. "Oakland remains fiercely determined to keep the Athletics in Oakland," Schaaf wrote in a statement on Twitter. "It is unfortunate the discussion with Peralta ended so abruptly, yet we're committed, more than ever, to working with the A’s and our community to find the right spot in Oakland for a privately-financed ballpark."

This latest setback comes less than one month after a design team of Sasaki, Snøhetta, Studio T-Square, and HOK were selected to design the new stadium.

Related Stories

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

Recreation facility scores with sustainable features

A new $79.1 million health and learning center is under construction on the Northern Arizona University campus in Flagstaff. The 270,000-sf facility will house recreation space, classrooms, health and counseling services, and the Lumberjack Stadium for track and soccer teams. Designed by the Phoenix office of OWP/P Cannon Design with Mortenson Construction as CM, the project is aiming for LEED ...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

TCF Bank Stadium first new football stadium to get LEED certification

The University of Minnesota has received LEED Silver certification for its 50,805-seat TCF Bank Stadium, making it the first new football stadium in the country to achieve LEED status. Designed by Populous, Kansas City, Mo., the facility features a stormwater management system that captures and stores rainwater in an underground filtering system, where it is harvested, filtered, and drained int...

| Aug 11, 2010

Construction begins on Louisiana State Sports Hall of Fame

Heavy construction and foundation work has started on the new Louisiana State Sports Hall of Fame and Regional History Museum in Natchitoches, La. Designed by Trahan Architects, Baton Rouge, the $12 million, 28,000-sf museum will be clad in sinker cypress planks as a nod to the region’s rich timber legacy and to help control light, views, and ventilation throughout the facility.

| Aug 11, 2010

Modest recession for education construction

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.

| Aug 11, 2010

Great Solutions: Green Building

27. Next-Generation Green Roofs Sprout up in New York New York is not particularly known for its green roofs, but two recent projects may put the Big Apple on the map. In spring 2010, the Lincoln Center for the Performing Arts will debut one of the nation's first fully walkable green roofs. Located across from the Juilliard School in Lincoln Center's North Plaza, Illumination Lawn will consist ...

| Aug 11, 2010

Dream Fields, Lone Star Style

How important are athletic programs to U.S. school districts? Here's one leading indicator: In 2005, the National Football League sold 17 million tickets. That same year, America's high schools sold an estimated 225 million tickets to football games, according to the American Football Coaches Association.

| Aug 11, 2010

Giants 300 University Report

University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021