Uponor recently announced its factory training schedule for 2013, which includes a new course on commercial plumbing applications. The course, which is eligible for continuing education units (CEUs), focuses on codes and standards, pipe sizing, unit piping, riser piping, distribution piping, public and service piping, and design and installation practices.
“We are continuing our momentum in the commercial plumbing sector by offering several options for professionals to learn more about Uponor PEX-a piping systems,” says Wes Sisco, training manager at Uponor. “This includes webinars, field training and now factory training with our newly constructed Commercial Plumbing Applications Lab.”
The new Commercial Plumbing Applications Lab features all of Uponor’s products and systems for suspended piping, risers, in-suite and out-of-the-wall plumbing systems to showcase the benefits of the flexible, durable pipe in real-world applications.
The two-day Commercial Plumbing Applications course is available six times throughout the year beginning in March. Attendees who complete the course are eligible for CEUs to meet continuing education requirements.
The 2013 Uponor Academy factory training schedule also includes Radiant Hydronics and Design with Controls and Advanced Radiant Hydronics with Advanced Design Suite (ADS), which are also eligible for CEUs.
To learn more about Uponor Academy factory training courses and to register, visit www.uponorpro.com/training.
Uponor, Inc.is a leading supplier of plumbing, fire safety and radiant heating and cooling systems for the residential and commercial building markets in the United States. Uponor, Inc. employs 380 people at its North American headquarters in Apple Valley, Minn. For more information, visit www.uponorpro.com, www.uponor-usa.comor call (800) 321-4739.
Related Stories
| Aug 11, 2010
Gold Award: Eisenhower Theater, Washington, D.C.
The Eisenhower Theater in the John F. Kennedy Center for the Performing Arts in Washington, D.C., opened in 1971. By the turn of the century, after three-plus decades of heavy use, the 1,142-seat box-within-a-box playhouse on the Potomac was starting to show its age. Poor lighting and tired, worn finishes created a gloomy atmosphere.
| Aug 11, 2010
AIA course: MEP Technologies For Eco-Effective Buildings
Sustainable building trends are gaining steam, even in the current economic downturn. More than five billion square feet of commercial space has either been certified by the U.S. Green Building Council under its Leadership in Energy and Environmental Design program or is registered with LEED. It is projected that the green building market's dollar value could more than double by 2013, to as muc...
| Aug 11, 2010
Great Solutions: Technology
19. Hybrid Geothermal Technology The team at Stantec saved $800,000 in construction costs by embedding geothermal piping into the structural piles at the WestJet office complex in Calgary, Alb., rather than drilling boreholes adjacent to the building site, which is the standard approach. Regular geothermal installation would have required about 200 boreholes, each about four-inches in diameter ...