The United States Holocaust Memorial Museum’s new David and Fela Shapell Family Collections and Conservation Center has broken ground at an undisclosed location. The 100,000-sf building is designed by SmithGroupJJR.
The new Shapell Center will provide the archival-quality environments to support the preservation of artifacts documenting the Holocaust, ensuring that the evidence of the genocide will not be lost to future generations. With planned expansion space, the Shapell Center will provide a home for the growing collection.
The facility is designed to balance collections and non-collections. The building is organized in two halves: a “clean” side accommodates collections-related activities that includes a reading room; artifact storage; conservations labs for the treatment objects, textiles, paper and photographs; and a collections processing suite with a photo studio for digitizing the collection. A “dirty” side provides standard conditioning for non-collections storage; isolated wood, metal and paint shops for exhibit design and production; and staff office space.
Construction of the Shapell Center is expected to be completed in early 2017. SmithGroupJJR’s design services include architecture, MEP engineering, lighting design, landscape architecture and interior design. SmithGroupJJR leads the broader design team which includes Weidlinger Associates, Inc., The Sextant Group, Inc. and Rummel Klepper & Kahl. DPR Construction is serving as the construction manager.
Related Stories
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 26, 2013
How biomimicry inspired the design of the San Francisco Museum at the Mint
When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.
| Jul 22, 2013
Cultural Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 2, 2013
LEED v4 gets green light, will launch this fall
The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.
| Jul 1, 2013
Report: Global construction market to reach $15 trillion by 2025
A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 25, 2013
Mirvish, Gehry revise plans for triad of Toronto towers
A trio of mixed-use towers planned for an urban redevelopment project in Toronto has been redesigned by planners David Mirvish and Frank Gehry. The plan was announced last October but has recently been substantially revised.