The United States Holocaust Memorial Museum’s new David and Fela Shapell Family Collections and Conservation Center has broken ground at an undisclosed location. The 100,000-sf building is designed by SmithGroupJJR.
The new Shapell Center will provide the archival-quality environments to support the preservation of artifacts documenting the Holocaust, ensuring that the evidence of the genocide will not be lost to future generations. With planned expansion space, the Shapell Center will provide a home for the growing collection.
The facility is designed to balance collections and non-collections. The building is organized in two halves: a “clean” side accommodates collections-related activities that includes a reading room; artifact storage; conservations labs for the treatment objects, textiles, paper and photographs; and a collections processing suite with a photo studio for digitizing the collection. A “dirty” side provides standard conditioning for non-collections storage; isolated wood, metal and paint shops for exhibit design and production; and staff office space.
Construction of the Shapell Center is expected to be completed in early 2017. SmithGroupJJR’s design services include architecture, MEP engineering, lighting design, landscape architecture and interior design. SmithGroupJJR leads the broader design team which includes Weidlinger Associates, Inc., The Sextant Group, Inc. and Rummel Klepper & Kahl. DPR Construction is serving as the construction manager.
Related Stories
University Buildings | Feb 18, 2022
On-campus performing arts centers and museums can be talent magnets for universities
Cultural facilities are changing the way prospective students and parents view higher education campuses.
Museums | Jan 25, 2022
Cooper Robertson selected to design master plan for Munson-Williams-Proctor Arts Institute
The project will seek public input regarding the campus master plan.
Museums | Jan 14, 2022
The Shedd Aquarium unveils its $500 million vision for the future
The project will prepare the aquarium for the next 100 years.
Museums | Dec 20, 2021
Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance
The museum is one of NYC’s only major museums with free admission.
Museums | Dec 7, 2021
The Palo Alto Junior Museum and Zoo completes
CAW Architects designed the project.
Giants 400 | Nov 19, 2021
2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector
Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.
Museums | Nov 10, 2021
Tampa Museum of Art announces $65 million expansion
Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.
Museums | Oct 29, 2021
Rowan University’s new fossil museum sits within an active dinosaur fossil dig
Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.
Museums | Oct 15, 2021
Kunsthaus Zürich extension opens to the public
David Chipperfield Architects Berlin designed the project.
Museums | Sep 27, 2021
The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles
Renzo Piano Building Workshop designed the project.