flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The U.S. hotel construction market sees record highs in the first quarter of 2024

Hotel Facilities

The U.S. hotel construction market sees record highs in the first quarter of 2024

More than 6,000 hotel projects are in the works across the nation, an all-time high according to Lodging Econometrics.


By Lodging Econometrics | April 24, 2024
Image by Engin Akyurt from Pixabay

Image by Engin Akyurt from Pixabay

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

The details can be seen directly within the stages of the pipeline, which all saw YOY growth in Q1. Presently, there are 1,144 projects comprising 141,336 rooms under construction, marking a 9% increase in projects and a 1% increase in rooms YOY. Projects slated to start construction in the next 12 months total 2,259 projects with 260,968 rooms, reflecting a 10% rise in projects and an 8% increase in rooms YOY. 

Notably, both projects and room counts in the early planning stage increased by 9% YOY, reaching record-high figures of 2,662 projects and 300,686 rooms, respectively. Of all the projects in the pipeline, a little over half of them are concentrated within the upscale, upper-midscale, and midscale chain scales. In Q1, the upper midscale and midscale segments hit record-high project and room counts. The luxury chain scale also reached a record-high project total in Q1.

The latest data from LE also highlights the dominance of extended-stay brands in the pipeline at Q1, a segment that developers have increasingly favored in recent years. These brands now account for 37% of the total projects under construction, 41% of projects scheduled to begin within the next 12 months, and 39% of projects in the early planning stage. Sixty-three percent of the extended stay projects in the pipeline are branded with brands within the middle tier extended stay segment.

Renovation and brand conversion activities in the U.S. have also seen significant growth, reaching record-high combined totals of 2,041 projects and 266,405 rooms. Brand conversions, in particular, have hit a new record-high of 1,235 projects with 114,680 rooms, growing 14% by projects YOY, while announced renovations at Q1 stand at 806 projects and 151,725 rooms. LE analysts anticipate this robust conversion and renovation activity to continue throughout 2024.

In terms of new hotel openings, the first quarter saw the opening of 114 new hotels with 15,506 rooms in the U.S. Over half of these opens, 72 hotels/8,269 rooms, were in suburban locations, and 60 hotels/10,036 rooms (or 53%/65%) of newly opened hotels were located within the top 50 markets. With a record number of projects in early planning and an increasing number of projects scheduled to start in the next 12 months, LE analysts project modest growth in new hotel openings through 2024. 

The LE forecast for the remainder of 2024 includes the opening of another 547 projects with 60,483 rooms, totaling 661 new hotels with 75,989 rooms and representing a 1.3% increase in new hotel supply by year-end. Looking ahead to 2025, LE analysts anticipate an additional 790 new hotels with 85,561 rooms to open in the U.S., resulting in a 1.5% supply increase.

Related Stories

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

McCarthy completes Santa Barbara Cottage Hospital Replacement Facility

The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021