As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.
The details can be seen directly within the stages of the pipeline, which all saw YOY growth in Q1. Presently, there are 1,144 projects comprising 141,336 rooms under construction, marking a 9% increase in projects and a 1% increase in rooms YOY. Projects slated to start construction in the next 12 months total 2,259 projects with 260,968 rooms, reflecting a 10% rise in projects and an 8% increase in rooms YOY.
Notably, both projects and room counts in the early planning stage increased by 9% YOY, reaching record-high figures of 2,662 projects and 300,686 rooms, respectively. Of all the projects in the pipeline, a little over half of them are concentrated within the upscale, upper-midscale, and midscale chain scales. In Q1, the upper midscale and midscale segments hit record-high project and room counts. The luxury chain scale also reached a record-high project total in Q1.
The latest data from LE also highlights the dominance of extended-stay brands in the pipeline at Q1, a segment that developers have increasingly favored in recent years. These brands now account for 37% of the total projects under construction, 41% of projects scheduled to begin within the next 12 months, and 39% of projects in the early planning stage. Sixty-three percent of the extended stay projects in the pipeline are branded with brands within the middle tier extended stay segment.
Renovation and brand conversion activities in the U.S. have also seen significant growth, reaching record-high combined totals of 2,041 projects and 266,405 rooms. Brand conversions, in particular, have hit a new record-high of 1,235 projects with 114,680 rooms, growing 14% by projects YOY, while announced renovations at Q1 stand at 806 projects and 151,725 rooms. LE analysts anticipate this robust conversion and renovation activity to continue throughout 2024.
In terms of new hotel openings, the first quarter saw the opening of 114 new hotels with 15,506 rooms in the U.S. Over half of these opens, 72 hotels/8,269 rooms, were in suburban locations, and 60 hotels/10,036 rooms (or 53%/65%) of newly opened hotels were located within the top 50 markets. With a record number of projects in early planning and an increasing number of projects scheduled to start in the next 12 months, LE analysts project modest growth in new hotel openings through 2024.
The LE forecast for the remainder of 2024 includes the opening of another 547 projects with 60,483 rooms, totaling 661 new hotels with 75,989 rooms and representing a 1.3% increase in new hotel supply by year-end. Looking ahead to 2025, LE analysts anticipate an additional 790 new hotels with 85,561 rooms to open in the U.S., resulting in a 1.5% supply increase.
Related Stories
| Aug 11, 2010
Colorado hospital wins LEED Gold
The main building of the Medical Center of the Rockies in Loveland, Colo., is a 136-bed regional medical center offering a full spectrum of services, with specialties in cardiac and trauma care. Constructed primarily of brick, native sandstone, and 85,000 sf of metal panels manufactured by Centria, the 600,000-sf main building, by Denver-based HLM Design, is one of the few hospitals in the nati...
| Aug 11, 2010
Design ups comfort, care in cancer center
A new cancer center is slated to open in fall 2011 at Banner Gateway Medical Center, Gilbert, Ariz. The three-story, 120,000-sf, $107 million cancer center will contain physician clinics, medical imaging, radiation oncology, infusion therapy, and support services. A/E firm Cannon Design has created a visually open, column-free interior to increase patient comfort and care.
| Aug 11, 2010
Charlotte hospital expands its surgery capabilities
The Chicago office of RTKL designed Carolinas HealthCare System's Mercy Medical Plaza, Charlotte, N.C. The 150,000-sf hospital houses 12 operating rooms with expanded pre-operative and recovery space, a pharmacy, and a central sterile processing unit. Tenant space occupies 75,000 sf. RTKL mimicked the materials and mass of older buildings on the campus but created a more modern look by using ex...
| Aug 11, 2010
And the world's tallest building is…
At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.
| Aug 11, 2010
Spa resort in harmony with mountain setting
The Sparkling Hill Resort and Wellness Hotel in Vernon, B.C., looks as if it was chiseled out of bedrock and jutting from the mountainside. Designed by the Victoria, B.C., office of Cannon Design, the 240,000-sf resort has 152 guest rooms with floor-to-ceiling windows and spa-like bathrooms, as well as a signature 20,000-sf whole-body wellness spa with treatment rooms designed to feel like they...
| Aug 11, 2010
Triangular tower targets travelers
Chicago-based Goettsch Partners is designing a new mixed-use high-rise for the Chinese city of Dalian, located on the Yellow Sea coast. Developed by Hong Kong-based China Resources Land Limited, the tower will have almost 1.1 million sf, which includes a 377-room Grand Hyatt hotel, 84 apartments, three restaurants, banquet space, and a spa and fitness center.
| Aug 11, 2010
Expanding retail complex is LEED pre-certified
The Promenade at Coconut Creek in Broward County, Fla., a live-work-play shopping and lifestyle center, is being expanded by 105,000 sf. When phase II of the 335,000-sf project is complete, the facility will house 75 retailers, restaurants, and related services, making it one of the largest mixed-use projects in northern Broward County.
| Aug 11, 2010
CityCenter projects get LEED Gold
MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...
| Aug 11, 2010
Philadelphia cancer center seeks LEED certification
The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...
| Aug 11, 2010
High-level NICU opens in Washington, D.C.
Design to the highest distinction available by the American Academy of Pediatrics, the new Level IIIC neonatal intensive care unit (NICU) at Children's National Medical Center in Washington D.C., is equipped to care for the sickest premature babies, including those that require open-heart surgery. The 54-bed facility, designed by Karlsberger with KLMK Group as space planner, is four times large...