The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE).
In the first quarter of 2022, there were 961 projects/128,784 rooms under construction, down 27% by projects and 28% by rooms YOY.
Projects scheduled to start in the next 12 months, at 1,911 projects/223,030 rooms, are up 2% by projects and 3% by rooms YOY. Projects and rooms in early planning reached a record high in the first quarter, standing at 2,218 projects/254,488 rooms, up 24% by projects and 12% by rooms YOY.
Notably, the upscale and upper-midscale chain scales dominate the pipeline in Q1 with 63% of projects in the total pipeline concentrated in these two chain scales. This has been the case for several years.
There were a total of 1,420 projects/184,692 rooms in the renovation or conversion pipeline in the U.S. during the first quarter. Project conversions and room conversions reached an all-time high in Q1, increasing 59% by projects and 48% by rooms YOY.
Hotel developers eager to break ground on new projects
New projects and development planning that was previously on hold are now getting the green light from investors and developers with buoyed confidence thanks to rather robust domestic leisure travel during the first part of the year. With stronger domestic leisure travel in the U.S., along with the albeit slower revival of corporate and group travel, there is growing confidence in the recovery. Developers are eager to move forward with plans and break ground as this upward trend in hotel business demand is expected to continue throughout 2022.
Through year-end 2021, the U.S. opened 826 projects accounting for 106,192 rooms. A total of 113 hotels/12,464 rooms opened in the first quarter of 2022. Over half of these opens, 68 hotels/7,154 rooms, were in suburban locations, but 41 hotels/4,703 rooms of newly opened hotels, or 36%, were in a top 25 market.
Reflective of the increasing number of projects in early planning and projects scheduled to start in the next 12 months, LE’s forecast for new hotel openings by projects has risen ever so slightly for 2023.
For the remainder of the year, LE forecasts another 649 projects/77,568 rooms to open for a total of 762 hotels/90,032 rooms in 2022, representing a 1.6% increase in new hotel supply. In 2023, LE forecasts an additional 839 hotels/93,169 rooms will open in the U.S., for a 1.6% supply increase.
Related Stories
| Dec 10, 2013
Modular Pedia-Pod: Sustainability in healthcare construction [slideshow]
Greenbuild 2013 in Philadelphia was the site of a unique display—Pedia-Pod, a modular pediatric treatment room designed and built by NRB, in collaboration with the editors of Building Design+Construction, SGC Horizon LLC, and their team of medical design consultants.
| Dec 3, 2013
Creating a healthcare capital project plan: The truth behind the numbers
When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process.
| Nov 27, 2013
Pediatric hospitals improve care with flexible, age-sensitive design
Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.
| Nov 27, 2013
Exclusive survey: Revenues increased at nearly half of AEC firms in 2013
Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.
| Nov 27, 2013
Wonder walls: 13 choices for the building envelope
BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina.
| Nov 26, 2013
Construction costs rise for 22nd straight month in November
Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Nov 19, 2013
Pediatric design in an adult hospital setting
Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.
| Nov 19, 2013
Top 10 green building products for 2014
Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list.
| Nov 18, 2013
6 checkpoints when designing a pediatric healthcare unit
As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.