STR’s April 2016 Pipeline Report shows 506,000 rooms in 4,125 projects under contract in the U.S. The total represents a 14.6% increase in the number of rooms under contract compared with April 2015.
Under contract data includes projects in the construction, final planning, and planning stages, but does not include projects in the unconfirmed stage.
In the construction stage, the U.S. reported 161,014 rooms in 1,241 projects, a 28.3% increase in year-over-year comparisons.
Among the Chain Scale segments, Upscale (55,994 rooms in 407 hotels) accounted for the most rooms in construction, followed by Upper Midscale (52,934 rooms in 523 hotels).
“The Upscale and Upper Midscale segments combine to represent more than 67% of total construction activity in the U.S., with almost 109,000 rooms between the two,” said Bobby Bowers, STR’s Senior VP for Operations. “Looking further down the road, these two segments combine for almost 207,000 rooms in the two planning phases. That means these segments will likely continue to experience significant supply increases over the next few years. It will be very interesting to monitor the effect on select-service occupancy.”
The Economy segment reported the least contract and construction activity but the largest year-over-year increases in rooms under contract (+41.2% to 4,731 rooms) and in construction (+94.8% to 1,276 rooms).
“The increase in activity is coming across the board,” Bowers said.
Every segment with the exception of Luxury (+7.9%) reported a double-digit increase in construction activity when compared with last April. Every segment outside of Unaffiliated (+2.4%) reported a double-digit lift in under contract.
Related Stories
Hotel Facilities | Jul 27, 2017
Hilton’s ‘Five Feet to Fitness’ suites turn hotel rooms into gyms
Over 11 different fitness equipment and accessory options are available in each suite.
Hotel Facilities | Jul 17, 2017
This space hotel design from MIT won NASA’s graduate design competition
The project team consisted of MIT graduate students across five departments.
Mixed-Use | Jul 7, 2017
ZHA’s Mandarin Oriental hotel and residences employs ‘stacked vases’ design approach
The mixed-use tower will rise 185 meters and be located in Melbourne's Central Business District.
Hotel Facilities | Jul 5, 2017
It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension
PPVC techniques allowed the project to save time and manpower.
Hotel Facilities | Jun 29, 2017
Luxury, plant-covered hotel unveiled for site near the River Seine
Kengo Kuma is designing the hotel, which will feature a large garden and a plant-covered façade.
Hotel Facilities | Jun 28, 2017
This floating hotel in Sweden freezes in place during the winter
The hotel will feature a cold bath and be in a good location for viewing the northern lights.
Hotel Facilities | Jun 14, 2017
Finalists selected for Radical Innovation award
Original hospitality design concepts lean on enhancing traveler comfort and mobility.
Hotel Facilities | May 19, 2017
Beyond market niches: Designing hotels that can flex
There’s a shift from accommodating to specific market niches towards places that can adapt to changing moods and activities.
Hotel Facilities | May 18, 2017
Manchester modular hotel is constructed of shipping containers
The 220-room Holiday Inn Express hopes to be completed in less than 12 months.
Events Facilities | Apr 27, 2017
20-acre lagoon highlights $1.5 billion Paradise Park planned for Las Vegas
The Wynn Resorts board recently gave the go-ahead for the project, which may begin construction on its first phase as early as December.